Decision Notice OPW14-0033 57 Wyuna Dv Noosaville · OPW14/0033

of 7

Text shows just the words. Original shows the document exactly as it was published.

                                                                            OPW14/0033



2.    Structures must be designed and constructed such that they are free standing
      within the waterway and are not connected to or behind the revetment wall or rock
      wall.

3.    No boatlifting devices are to be attached or moored at the pontoon structure for the
      purpose of elevating a vessel above the water without Council approval.

4.    The catwalk must be constructed in a manner to render the underside area vermin
      proof.

5.    There must be no electrical reticulation system carrying electricity in excess of 24
      volts beyond the revetment wall unless all switches and power outlets are
      positioned above the 1%AEP flood level.

6.    Lighting associated with the use must be designed, installed, operated, and
      maintained in accordance with Section 3 of AS4282 Control of the Obtrusive
      Effects of Outdoor Lighting.

7.    The pontoon is to be used for private purposes only and no commercial operations
      are to be undertaken.

8.    Boat repair activities are not permitted on site.

9.    Wastewater and sullage must only be disposed of at approved pumpout facilities.

10.   The mooring facility must not be utilised for live-aboard purposes.

11.   Any construction and post construction activity is not to impact on the condition of
      the waterway, and is to be conducted so as not to breach the Environmental
      Protection Act (EPA) 1994 and the Environmental Protection (Water) Policy 2009.

12.   The approval or conditions do not constitute a ruling on structural safety and the
      applicant must make their own arrangements to ensure adequacy of design and
      work. Also any approval granted does not warrant that such plans and
      specifications have been checked in detail, nor does it absolve the owner of the
      land from complying with all the conditions of this approval and/or relevant Council
      By-Laws and Policies and/or relevant statutes and/or statutory regulations in the
      execution and/or performance of said works. The Council does not accept any
      responsibility for the accuracy of such plans and specifications as approved.

13.   Certification by a Registered Professional Engineer of Queensland must be
      submitted to Council. The certification must state that the pontoon and associated
      structures have been constructed in accordance with best practice methods, are in
      accordance with Coastal Protection and Management Act 1995, are structurally
      sound and will have no detrimental affect on the existing revetment walls.

14.   A final inspection and approval of the structure by Council’s Inspector is also
      required. Please contact Council’s Planning Assessment Section (Development
      Audit & Response Officer 0428738563) to arrange the inspection.

15.   This approval lapses where the construction of the pontoon has not been
      commenced within two (2) years of the date of issue of the approval, unless
      application is made and approved by Council for an extension.


                                                                                  Page 2 of 7

Used in these records

About this file

File size
44 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice OPW14-0033 57 Wyuna Dv Noosaville.pdf · 44 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.