                                                                                 OPW14/0033



16.   After completion, the proposed works must be maintained in a sound state of
      repair in accordance with the approved plans.

17.   All necessary State government approvals relating to this development must be
      obtained prior to any works commencing on the site.

5.    REFERRAL AGENCIES

The referral agencies applicable to this application are:
Referral          Referral Agency and        Referral Trigger         Response
Status            Address
Concurrence       SARA at DSDIP Mike         Schedule 7, Table 2,     The agency provided its
                  Ahern Government           Item 13 (Tidal Works)    response on 12/02/14
                  Building 12 First Avenue   Schedule 7, Table 2,     (Reference No. SPL-
                  MAROOCHYDORE               Item 15 (Tidal Works)    0114-007734). A copy of
                  QLD 4558 Online:                                    the response is attached.
                                             Schedule 7, Table 2,
                  Mydas (at
                                             Item 27 (Land
                  www.dsdip.qld.gov.au)
                                             Adjoining FHA)
                  Email:[email protected]

6.    APPROVED PLANS

The following plans are Approved Plans for the development:

Approved Plans
Plan No.           Rev.   Plan Name                                             Date
JSP-SJ-26530       A      Site Plan, Layout and Water Allocation, prepared      2 December 2013
                          by Cardno
JSP-SJ-26531       B      Elevation, prepared by Cardno                         2 December 2013
JSP-GW-006         E      Standard Catwalk Construction, prepared by            12 March 2003
                          Cardno
JSP-SD-102         D      Pile Bracket Construction to Suit 315Ø – 350Ø         1 September 2005
                          Piles, prepared by Cardno
JSP-SD-045         C      315 & 400 Diameter Reinforced Concrete Insitu         20 April 1999
                          Pile Construction, prepared by Cardno
JSP-SD-100         D      Pontoon    Construction   Details,    prepared   by   31 August 2005
                          Cardno

7.    REFERENCED DOCUMENTS

Not Applicable.




                                                                                       Page 3 of 7

Used in these records

About this file

File size
44 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice OPW14-0033 57 Wyuna Dv Noosaville.pdf · 44 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.