Council archive · source document
REC14/0008 St 5 Reconfiguration 2 lots into 6 lots Report & Plans
Plans and drawings: the text below has words only, no drawings.
Very large file (15.9 MB): may take a few minutes to open.
SOO Specific Outcomes c) stormwater drainage; d) — power supply; and e) — telecommunications; AND 016 The design and provision of public services and utilities, including sewerage, water, electricity, street lighting and telecommunication services— a) meets the needs of users; b) ensures health, safety and convenience of the community; c) protects the natural environmental values of the site and surrounds, including visual amenity and native vegetation; d) are cost effective over their life cycle; e) minimises adverse impacts to the environment (including the amenity of the local area) in the short and long term; and f) ensures that the existing systems are upgraded or relocated to be capable of supporting the proposed development; AND 017 Essential public utilities are available and maintain their function during flood events up to a 1% AEP (1:100 year AR?) flood event. Bioretention Basin. Electricity supply infrastructure 018 Uses and works maintain a safe distance from electrical infrastructure including substations, overhead power lines, power poles and transformers. All newly subdivided lots are located away from any easements and in excess of 50m from any substations. Earthworks and stormwater management 019 Stormwater run-off is managed so as not to cause any adverse impacts on the built or natural environment including changes in quality, quantity or location of stormwater discharges. Each lot has appropriate means of disposing stormwater with a proposed stormwater pipe to collect all runoff from the development for it to be treated in the BioRetention Basin. 020 Filling or excavation only occurs where it does not adversely impact on— a) watercourses, drainage lines and wetlands; or b) vegetation on land identified on Biodiversity Overlay Maps OM1.1-OM9.1; or c) water levels on properties elsewhere. No filling or excavation will occur on any important areas and there will no impact on Biodiversity values of the site. Landscaping and visual amenity O21 Land development responds to the distinctive landscape character of the site by utilising the natural features of the site, which include— a) watercourses and drainage lines; b) _ significant trees; c) understorey vegetation; d) rock outcrops; and e) views. The natural landform and landscape are not modified to accommodate the development.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
REC14/0008 St 5 Reconfiguration 2 lots into 6 lots Report & PlansRelated documentApplication case desk ↗
About this file
- File size
- 15.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.