Original source · versioned page text
2015-11-10 Planning & Organisation Committee Agenda
The original of this document is very large (15.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 10 NOVEMBER 2015
ENGINEERING
External Works
10. That part of Top Forestry Road extending from the intersection with Old Ceylon Road to the
entrance to the site must be upgraded. The works must be undertaken in accordance with
an Operational Works approval and must include in particular:
a. Widening and sealing of the existing road pavement to a width sufficient to allow two
heavy vehicles to pass. The new formation must be sufficient to cater for the
expected vehicles
b. The works must be approved, completed and accepted “On Maintenance” for a
minimum maintenance period of 52 weeks for roadworks, stormwater drainage and
frontage works as set out in section 5.5 of “Planning Scheme Policy 5 – Engineering
Design Standards – Roads, Drainage and Earthworks” in effect at the
Commencement Date, prior to the commencement of the use for Animal Husbandry -
Type 2 (Intensive Poultry Farm).
c. The upgrading of Top Forestry Road must be provided by the applicant/owner
generally in accordance with the plans prepared by Lambert & Rehbein contained in;
i. B14101-SK-0004 (Rev B) dated 8/5/2015
ii. B14101-SK-0005 (Rev C) dated 28/4/2015
iii. B14101-SK-0006 (Rev A) dated 6/1/2015
iv. B14101-SK-0007 (Rev A) dated 6/1/2015
d. The works shall extend from the proposed entrance to the site to the existing
formation at Old Ceylon Road, including the following amendments:
i. Plan No. B14101-SK-004 (Rev B) dated 8/5/2015
a. Delete the table titled “Review of Existing Road Width vs Required 6m
Road Width of Suitable Pavement Material”
b. Include additional notes
1. “The unbound pavement must extend beyond the formation width into
the 1 on 4 shoulder where necessary”,
2. “The final design of the pavement must be undertaken in accordance
with the conditions of the operational works approval”,
3. “Table drains to be widened at cross drainage culverts where
necessary”,
4. “The road must be constructed with a minimum 6m wide sealed
surface.”, and
5. The sealed surface must be widened where required at the bends (a
minimum of 7m wide at the major bend at approximately Ch1100 to
ch1200).”
c. Clearly indicate the full extent of the proposed banks and batters.
ii. Plan No. B14101-SK-005 (Rev C) dated 28/4/2015
a. Include additional notes
1. “The pavement designs shown on the engineering drawings are not
approved. The final design of the pavement must be undertaken in
accordance with the conditions of the operational works approval“,
Page 22 of 201
See the original
The page text is free to read. Viewing or downloading an original file needs an account.