Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

2015-11-10 Planning & Organisation Committee Agenda

of 187

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (15.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                             10 NOVEMBER 2015


                       2. “The cut batter indicated on the plan is typical only and is subject to
                          localised geotechnical investigation at the time of final design and
                          submission of an Operational Works application. Should the localised
                          geotechnical investigation conclude that the typical section is not
                          achievable or Council considers that the extent of works and
                          vegetation removal is excessive, Council reserves the right to require
                          the construction of a suitable engineered solution. All works are to be
                          constructed at no cost to Council.”
                  b.   Clearly indicate the full extent of the proposed banks and batters
           iii.   Plan No. B14101-SK-006 (Rev A) dated 6/1/2015
                  a.   Extend the cross section at Ch140 to indicate the full extent of banks and
                       batters (to the point where they meet with natural surface)
      Traffic Management
11.   No heavy vehicles associated with the use are to park, wait or “hold” on:
      a.    The residential streets of Cooroy township,
      b.    Cooroy Belli Creek Road,
      c.    Old Ceylon Road, or
      d.    Top Forestry Road
12.   The maximum number of heavy vehicle movements associated with the use of the site
      (including existing cropping and proposed poultry operations) must not exceed 26 trips in
      any one day (1 trip being equivalent to a heavy vehicle travelling to the site).
13.   Heavy vehicles travelling along the haul route must be limited to between the hours of 6am
      until 7pm, 7 days per week. A register is to be kept on site at all times detailing the number
      of heavy vehicle movements travelling to and from the site and times, which is to be
      available for inspection by Council officers upon written request.
14.   The haul route must be to/from the Bruce Highway via Top Forestry Road, Old Ceylon
      Road, Cooroy-Belli Creek Road, Maple Street, Crystal Street and Myall Street. The haul
      route may be varied when the approved route is inaccessible due to accident, repairs or
      weather conditions, subject to prior written approval from Council.
      Site Access and Driveways
15.   An access driveway must be provided from Top Forestry Road to all parking and
      manoeuvring areas of the development. The works must be undertaken in accordance with
      an Operational Works approval and must be generally in accordance with Callaghan and
      Toth drawings numbered 1209-09 to 17.
16.   All redundant vehicular crossings to the site must be removed and replaced by landscaping
      such as trees and grasses in accordance with Council’s Standard specifications prior to
      commencement of the use permitted by this permit
      Earthworks
17.   The earthworks proposed on-site for the construction of the sheds, access driveway and
      manoeuvring areas must be undertaken in accordance with an Operational Works approval
      and must be:
      a.    generally in accordance with the Preliminary Road Layout Plans, numbered 1209-05
            to 17 prepared by Callaghan and Toth; and
      b.    in accordance with the recommendations of the Geotechnical and Slope Stability
            Investigation prepared by Coffey Geotechnics reference GEOTKPAR01945AA/A
            dated 23 April 2013.


                                                                                   Page 23 of 201
Log in to download the original file

2015-11-10 Planning & Organisation Committee Agenda(PDF, 15MB).pdf · 15.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.