Skip to the record
For the highest quality transcripts.

Original source · versioned page text

2015-11-10 Planning & Organisation Committee Agenda

of 187

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (15.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                       10 NOVEMBER 2015


      b.      a concentration of particulate matter with an aerodynamic diameter of less than 10
              micrometre (μm) (PM10) suspended in the atmosphere of 50 micrograms per cubic
              metre over a 24 hour averaging time, when monitored in accordance with Australian
              Standard AS 3580.9.6 (or more recent editions
SCHEDULE D – WATER
24.   Contaminants or contaminated water must not be directly or indirectly released from the
      premises to surface water or groundwater at or outside the Premises except for:
      a.      uncontaminated overland stormwater flow; or
      b.      uncontaminated stormwater to the stormwater system.
25.   Contaminants or contaminated water may be released to sewer under and in accordance
      with a trade waste permit granted by Unity Water under the Water Supply (Safety &
      Reliability) Act 2008.
26.   The Operator must ensure that:
      a.      maintenance and cleaning of equipment is carried out in an area where contaminants
              cannot be released into stormwater drainage, a roadside gutter, water or onto
              unsealed ground;
      b.      any spillage of contaminants is cleaned up immediately by a method other than
              hosing, sweeping or otherwise releasing the contaminants into stormwater drainage,
              a roadside gutter or water; and
      c.      incident rainfall and overland flow of stormwater does not contact contaminants (for
              example, areas with contaminants should be roofed or be protected by diversion
              drains).
27.   All areas that contain contaminants, or areas where potentially contaminating activities are
      carried out, must be drained to a treatment device for treatment prior to release or reuse on
      site. The design and construction of the treatment device must be undertaken in
      accordance with an Operational Works approval.
28.   Nutrient, pathogen and contaminant levels in stormwater discharged from the site must not
      exceed the water quality guideline levels of the Australian and New Zealand Guidelines for
      Fresh and Marine Water Quality 2000, and/or result in the exceedance of the water quality
      objectives for waters listed in Schedule 1 of the Environmental Protection (Water) Policy
      2009.
SCHEDULE E – NOISE
29.   Noise from the activity must not exceed the levels identified in the following table and the
      associated requirements at any nuisance sensitive place or commercial place.
Noise level                  Monday to Saturday                         Sunday and Public Holidays
measured in
                 7am-6pm         6pm-10pm         10pm-7am       9am-6pm           6pm-10pm       10pm-9am
  dB(A)
                                        Noise measured at a nuisance sensitive place
 LAeq adj,T     Background      Background        Background   Background       Background       Background
                    +5              +3                +3           +5               +3               +3
 MaxLpA,T       Background      Background        Background   Background       Background       Background
                   +10              +8                +5          +10               +8               +5
                                            Noise measured at a commercial place
 LAeq adj,T     Background      Background        Background   Background       Background       Background
                   +10              +8                +5          +10               +8               +5
 MaxLpA,T       Background      Background        Background   Background       Background       Background
                   +15             +13               +10          +15              +13              +10




                                                                                              Page 27 of 201
Log in to download the original file

2015-11-10 Planning & Organisation Committee Agenda(PDF, 15MB).pdf · 15.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.