PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 10 NOVEMBER 2015
b. a concentration of particulate matter with an aerodynamic diameter of less than 10
micrometre (μm) (PM10) suspended in the atmosphere of 50 micrograms per cubic
metre over a 24 hour averaging time, when monitored in accordance with Australian
Standard AS 3580.9.6 (or more recent editions
SCHEDULE D – WATER
24. Contaminants or contaminated water must not be directly or indirectly released from the
premises to surface water or groundwater at or outside the Premises except for:
a. uncontaminated overland stormwater flow; or
b. uncontaminated stormwater to the stormwater system.
25. Contaminants or contaminated water may be released to sewer under and in accordance
with a trade waste permit granted by Unity Water under the Water Supply (Safety &
Reliability) Act 2008.
26. The Operator must ensure that:
a. maintenance and cleaning of equipment is carried out in an area where contaminants
cannot be released into stormwater drainage, a roadside gutter, water or onto
unsealed ground;
b. any spillage of contaminants is cleaned up immediately by a method other than
hosing, sweeping or otherwise releasing the contaminants into stormwater drainage,
a roadside gutter or water; and
c. incident rainfall and overland flow of stormwater does not contact contaminants (for
example, areas with contaminants should be roofed or be protected by diversion
drains).
27. All areas that contain contaminants, or areas where potentially contaminating activities are
carried out, must be drained to a treatment device for treatment prior to release or reuse on
site. The design and construction of the treatment device must be undertaken in
accordance with an Operational Works approval.
28. Nutrient, pathogen and contaminant levels in stormwater discharged from the site must not
exceed the water quality guideline levels of the Australian and New Zealand Guidelines for
Fresh and Marine Water Quality 2000, and/or result in the exceedance of the water quality
objectives for waters listed in Schedule 1 of the Environmental Protection (Water) Policy
2009.
SCHEDULE E – NOISE
29. Noise from the activity must not exceed the levels identified in the following table and the
associated requirements at any nuisance sensitive place or commercial place.
Noise level Monday to Saturday Sunday and Public Holidays
measured in
7am-6pm 6pm-10pm 10pm-7am 9am-6pm 6pm-10pm 10pm-9am
dB(A)
Noise measured at a nuisance sensitive place
LAeq adj,T Background Background Background Background Background Background
+5 +3 +3 +5 +3 +3
MaxLpA,T Background Background Background Background Background Background
+10 +8 +5 +10 +8 +5
Noise measured at a commercial place
LAeq adj,T Background Background Background Background Background Background
+10 +8 +5 +10 +8 +5
MaxLpA,T Background Background Background Background Background Background
+15 +13 +10 +15 +13 +10
Page 27 of 201
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.