Original source · versioned page text
2015-11-10 Planning & Organisation Committee Agenda
The original of this document is very large (15.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 10 NOVEMBER 2015
Control measures and operating procedures for routine operations to minimise
likelihood of environmental harm;
Maintenance practices and procedures;
Routine observations of odour and dust and recording the management response to
elevated levels;
Monitoring and sampling of stormwater nutrient and contaminant levels associated
with shed litter clean out at lawful points of site discharge;
Contingency plans and emergency procedures to deal with risks and hazards
including corrective responses to prevent and minimise environmental harm
(including any biosecurity incident);
Monitoring of contaminant releases;
Environmental impact assessments to be undertaken where identified as required in
relation to carrying out the objectives of the SBMP;
Vermin control measures;
Record keeping, staff training and handling and review of environmental complaints;
and
Periodic review of environmental performance and continual improvement.
15. The operator must ensure that the activities at the premises comply with the SBMP.
16. The operator must conduct daily inspections to identify wet litter.
17. Litter that cannot be returned to a friable state within 48 hours of turning or treating must be
removed from poultry sheds.
18. A minimum shed litter depth of 45 mm must be maintained at all times.
19. Shed litter must be completely replaced in each poultry shed at the end of each batch.
20. The design and construction of the shed flooring system and bunded litter storage areas
must include an impervious membrane e.g. concrete, such that moisture and/or
contaminants are not released to subsurface soil or groundwater.
21. Sheds must be designed and constructed with tunnel ventilation exhaust fans located in
accordance with the following:
Shed 1 - Eastern Wall
Shed 2 - South-western Wall
Shed 3 - Northern Wall
Shed 4 - Southern Wall
Shed 5 - Northern Wall
Shed 6 - North-eastern Wall
Shed 7 - Western Wall
Shed 8 - Western Wall
SCHEDULE C – AIR & DUST
22. Odours or airborne contaminants which are noxious or offensive or otherwise unreasonably
disruptive to public amenity or safety must not cause nuisance to any nuisance sensitive
place or commercial place.
23. Dust and particulate matter emissions must not exceed the following concentrations at any
sensitive place or commercial place:
a. dust deposition of 120 milligrams per square metre per day, when monitored in
accordance with Australian Standard AS 3580.10.1 (or more recent editions), or
Page 26 of 201
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.