Original source · versioned page text
2015-11-10 Planning & Organisation Committee Agenda
The original of this document is very large (15.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 10 NOVEMBER 2015 RECOMMENDATION That Council note the report by the Development Planner to the Planning & Organisation Committee Meeting dated 13 October 2015 regarding Application No. MCU14/0039 & REC15/0012 for a Development Permit for Material Change of Use - Cultivation Type 2 – Intensive (Greenhouse) & Development Permit for Reconfiguring a Lot (Access Easement) situated at 271 & 305 Lake Macdonald Dr, Lake Macdonald and: A. Approve the applications in accordance with the following conditions: Development Permit for Material Change of Use - Cultivation Type 2 – Intensive (Greenhouse) PLANNING When Conditions must be Complied With 1. Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to the use commencing, and then compliance maintained at all times while the use continues. Approved Plans 2. Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date D-01569-06-B Site Plan drawn by Martoo Consulting 23/06/2015 3. The development must be undertaken and operated in a manner that causes no detrimental effect upon the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other emissions. Building Height 4. The maximum height of the development must not exceed 8 metres above the finished ground level and the natural ground level. Performance Bond 5. Security in the form of a cash bond or trading bank guarantee to the sum of $20,000 must be submitted to Council, to secure performance of all conditions of this approval, prior to the issue of a Development Permit for Operational Works. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit. Council reserves the right to call upon the bond or guaranteed sum to effect compliance with conditions. 6. All grow media, grow bags and plants within the greenhouse shall be raised above the 10% AEP flood level. Any structures supporting the crop (including the building frame) shall be designed to withstand minimum velocities associated with a 1% AEP Flood. Certification confirming the heights and strength of the structures must be submitted to Council from a suitably qualified professional (RPEQ) prior to the issue of an Operational Works approval. The elevated planting system must be installed prior to planting the next crop. 7. The use must be undertaken in accordance with the Flood Management Plan R01 v02, by Water Technology and dated 31/08/2015, subject to the following amendments; a. A nominated flood warden be on site at all times during operation hours of the facility; Page 57 of 201
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.