Original source · versioned page text
2015-11-10 Planning & Organisation Committee Agenda
The original of this document is very large (15.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 10 NOVEMBER 2015
b. A contingency for a flood refuge area must be defined in the strategy in the
event that persons become trapped on site. The flood refuge area should be
suitable for safe refuge during an extreme flood event.
c. Flood warnings issued by the Bureau of Meteorology and/or Council must be
added as a trigger, in addition to the site's flood gauge.
The amendments must be incorporated into an amended Flood Management Plan
which must be submitted to Council prior to the issue of an Operational Works
approval.
Waste
8. The developer must provide waste storage and disposal facilities in accordance with
Planning Scheme Policy 9, Waste Management, including a waste storage area large
enough to accommodate all potential sources of contamination, including hazardous
materials, chemicals, used grow media (including plastics) and waste bins located
well above the 1% AEP flood level.
ENGINEERING
Site Access and Driveways
Lake Macdonald Drive frontage
9. An access driveway to service the existing dwelling must be provided extending from
the formation of Lake Macdonald Drive to the property boundary. The works must be
undertaken in accordance with an Operational Works approval and must include in
particular a driveway crossover generally in accordance with IPWEAQ standard
drawing 056.
10. This access driveway is to be used only for the residential use on the site. This
access may be used for access for the agricultural use on the site (passenger and
heavy vehicles) in an emergency situation when the heavy vehicle access through
the property to the south is not accessible. When used during an emergency
situation, suitable Traffic Control measures must be employed. The type and extent
of Traffic Control measures must be included in the Operational Works application for
the construction of the access driveway.
Access driveway through the adjoining property (271 Lake Macdonald Dr/Lot 2
SP108094)
11. An access driveway to service the agricultural use must be provided extending from
the formation of Lake Macdonald Drive to the greenhouse. The works must be
undertaken in accordance with an Operational Works approval and must include in
particular:
a. an access and internal driveway generally in accordance with the report
prepared by TTM Consulting Pty Ltd dated 2 July 2015 reference 15SCT0024.
b. a driveway constructed with a suitable “all weather” surface that can cater for
the effects of occasional inundation by flood waters.
c. a driveway that does not create any additional flooding of Lot 2 SP108094 or
any adjoining property.
12. Approval of the driveway design from the owner of Lot 2 SP108094 must be
submitted to Council with the Operational Works application.
Page 58 of 201
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.