ORDINARY MEETING AGENDA 17 FEBRUARY 2022
Signage
57. Advertising devices must comply with Council’s signage policy.
OPERATIONAL WORKS - OPW21/0031
Approved Plans
58. Development undertaken in accordance with this approval must generally comply with
the approved plans of development. The approved plans are listed in the following table
unless otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
SD02 12 Ground / Carpark Plan, prepared by Archicology P/L 08/07/2021
A6035/21/EW01 F Earthworks Layout Plan, prepared by Alta Engineering 25/05/2021
A6035/21/R01 F Roadworks Layout Plan, prepared by Alta Engineering 25/05/2021
A6035/21/R03 E Roadworks Doonella Street – Cross Sections, prepared 25/05/2021
by Alta Engineering
A6035/21/R04 B Roadworks Setout Plan, prepared by Alta Engineering 25/05/2021
A6035/21/R08 A Roadworks Boundary Cross Sections, prepared by Alta 25/05/2021
Engineering
A6035/21/D01 E Stormwater Layout Plan, prepared by Alta Engineering 25/05/2021
A6035/21/D02 E Stormwater Drainage Details, prepared by Alta 25/05/2021
Engineering
A6035/21/D03 B Stormwater Drainage Setout Plan, prepared by Alta 25/05/2021
Engineering
A6035/21/WQ01 E Stormwater Treatment Catchment Plan, prepared by Alta 25/05/2021
Engineering
A6035/21/WQ02 E Stormwater Quality Layout Plan and Notes, prepared by 25/05/2021
Alta Engineering
A6035/21/WQ03 E Stormwater Quality Bio Basin Calculations and Details, 25/05/2021
prepared by Alta Engineering
CD-001 J Vegetation Management Plan, prepared by Project Urban 2021.05.28
CD-002 L Landscape Plan – In Ground, prepared by Project Urban 2021.05.28
CD-003 K Landscape Plan – In Ground, prepared by Project Urban 2021.01.25
CD-004 I Landscape Plan – On Podium, prepared by Project Urban 2021.01.25
CD-005 I Landscape Plan – Boundary Fences, prepared by Project 2021.01.25
Urban
CD-200 L Construction Details, prepared by Project Urban 2021.01.25
CD-201 C Planting Schedule, prepared by Project Urban 2021.01.28
CD-202 B Planting Schedule, prepared by Project Urban 2021.07.07
CURRENCY PERIOD
59. The Currency Period for this development approval lapses if the development has not
substantially started by 17 February 2024, unless an application to extend the currency
period is approved by Council.
PRIOR TO COMMENCEMENT OF WORKS
Engineering
60. All necessary approvals from external service providers (e.g. Unitywater) and external
parties on which the development works are proposed have been obtained and a copy
supplied to Council.
61. A condition report of the drainage system must be completed for agreement prior to the
prestart meeting. The condition report is to include a CCTV inspection of the existing
pipe and must include at least 50m upstream and downstream of all works.
62. A condition report including photographs of the frontage of the site must be completed
and submitted to council prior to the prestart meeting.
63. Certificates demonstrating currency of public liability insurance and works insurance
Page 20 of 29