ORDINARY MEETING AGENDA                                                        17 FEBRUARY 2022


    66.   Any changes to the details associated with the supervising RPEQ or Principal Contractor
          during construction, must be notified to council in writing within five business days of the
          change occurring.
    67.   Any conflict between the development and an existing or proposed service must be
          referred to the relevant service authority for determination prior to commencement of
          works.
    DURING CONSTRUCTION
    Engineering
    68.   All works must be supervised by a Registered Professional Engineer of Queensland
          (RPEQ) who is independent of the Developer and Principal Contractor, and they must
          certify that all works conform to the Operational Works permit. Where municipal works
          are involved, such confirmation must be submitted for the respective hold points prior to
          any site inspection by Council Officers.
    69.   All works must be constructed and work procedure undertaken in accordance with:
          a.    The approved plans/documents and conditions detailed in this Decision Notice;
          b.    All relevant Noosa Council Planning Scheme Policies, standard drawings,
                standard specifications and guidelines;
          c.    The latest version of the Healthy Waterways document “Water Sensitive Urban
                Design Technical Design Guidelines for South East Queensland” for all water
                quality devices to be constructed on site.
    Roadworks
    70.   The installation and/or modification of any traffic signs, street signs, line marking and
          Raised Reflective Pavement Markings (RRPMs) must be in accordance with the Manual
          of Uniform Traffic Control Devices (MUTCD). New or relocated signage must be installed
          using the VLok installation system. All new signage must be Class 1 retroreflective
          material in accordance with AS 1906.1, Retroreflective materials and devices for road
          traffic control purposes – Part 1: Retroreflective sheeting.
    71.   The developer must notify Council’s Traffic Engineer for any works involving the removal
          or modification of existing council traffic signs and/or parking bays prior to such works
          commencing.
    Pavement Design and Construction
    72.   Pavement design for privately owned works must be undertaken in accordance with the
          relevant standards. Structural integrity of the driveway and car park areas will remain
          the responsibility of the property owner/developer and must be certified by an RPEQ.
    Works within Road Reserve/Reinstatement
    73.   Safe pedestrian access on all streets in the vicinity of the development must be
          maintained at all times. Should footpath/road closures be necessary to carry out
          construction works, Council’s Engineering Officer must be notified prior to the proposed
          closure and all requirements complied with.
    74.   All frontage works must match neatly with existing road and verge/footpath features.
          Additional works beyond the frontage may be required to provide an acceptable transition
          to existing road and verge/footpath profiles.
    75.   Electrical conduits or other services proposed to be installed within existing and
          proposed road reserves under existing sealed carriageways, concrete pathways,
          concrete/sealed driveways or significant vegetation must be installed by boring.
          Trenching is not permitted, unless specifically approved by Council.



                                                                                      Page 22 of 29
Log in to download the original file

2022-02-17 Ordinary Meeting Agenda(PDF, 431KB).pdf · 441 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.