ORDINARY MEETING AGENDA 17 FEBRUARY 2022
66. Any changes to the details associated with the supervising RPEQ or Principal Contractor
during construction, must be notified to council in writing within five business days of the
change occurring.
67. Any conflict between the development and an existing or proposed service must be
referred to the relevant service authority for determination prior to commencement of
works.
DURING CONSTRUCTION
Engineering
68. All works must be supervised by a Registered Professional Engineer of Queensland
(RPEQ) who is independent of the Developer and Principal Contractor, and they must
certify that all works conform to the Operational Works permit. Where municipal works
are involved, such confirmation must be submitted for the respective hold points prior to
any site inspection by Council Officers.
69. All works must be constructed and work procedure undertaken in accordance with:
a. The approved plans/documents and conditions detailed in this Decision Notice;
b. All relevant Noosa Council Planning Scheme Policies, standard drawings,
standard specifications and guidelines;
c. The latest version of the Healthy Waterways document “Water Sensitive Urban
Design Technical Design Guidelines for South East Queensland” for all water
quality devices to be constructed on site.
Roadworks
70. The installation and/or modification of any traffic signs, street signs, line marking and
Raised Reflective Pavement Markings (RRPMs) must be in accordance with the Manual
of Uniform Traffic Control Devices (MUTCD). New or relocated signage must be installed
using the VLok installation system. All new signage must be Class 1 retroreflective
material in accordance with AS 1906.1, Retroreflective materials and devices for road
traffic control purposes – Part 1: Retroreflective sheeting.
71. The developer must notify Council’s Traffic Engineer for any works involving the removal
or modification of existing council traffic signs and/or parking bays prior to such works
commencing.
Pavement Design and Construction
72. Pavement design for privately owned works must be undertaken in accordance with the
relevant standards. Structural integrity of the driveway and car park areas will remain
the responsibility of the property owner/developer and must be certified by an RPEQ.
Works within Road Reserve/Reinstatement
73. Safe pedestrian access on all streets in the vicinity of the development must be
maintained at all times. Should footpath/road closures be necessary to carry out
construction works, Council’s Engineering Officer must be notified prior to the proposed
closure and all requirements complied with.
74. All frontage works must match neatly with existing road and verge/footpath features.
Additional works beyond the frontage may be required to provide an acceptable transition
to existing road and verge/footpath profiles.
75. Electrical conduits or other services proposed to be installed within existing and
proposed road reserves under existing sealed carriageways, concrete pathways,
concrete/sealed driveways or significant vegetation must be installed by boring.
Trenching is not permitted, unless specifically approved by Council.
Page 22 of 29