ORDINARY MEETING AGENDA                                                         17 FEBRUARY 2022


    101. The developer must ensure non-essential exposure of soil is prevented by restricting the
         extent of disturbance and minimising the duration of soil exposure to adverse weather
         conditions and effectively turf, cover or stabilise any disturbed area without delay and
         prior to rainfall occurring.
    102. The developer in conjunction with the engaged CPESC must ensure measures installed
         to divert the upstream water are designed and certified by the supervising RPEQ and
         installed prior to commencement of bulk earthworks.
    103. The developer must ensure sediment does not leave the site or enter onto adjoining
         properties or Council’s drainage system due to surface runoff or on tyres of vehicles
         and/or machinery. It is essential to implement appropriate approved erosion and
         sediment control measures throughout the site during all phases of construction including
         vehicle shakedown pad/grid (or similar) at the access to the construction site. Where
         sediments or other contaminants are deposited on a road, they must be removed so as
         not to enter Council’s drainage system or waterways.
    104. Prior to the completion of the development, all site surfaces must be effectively stabilised.
         For the purpose of this condition, an effectively stabilised surface is defined as one that
         does not, or is not likely to result in visible evidence of soil loss caused by sheet, rill or
         gully erosion or lead to sedimentation, or lead to water contamination.
    Water Sensitive Design
    105. The active filter media of the bioretention device must be 27m². Active filter media area
         is the area of the bioretention basin surface that is not covered by any impermeable
         structure such as a sediment forebay, riser, etc.
    106. During construction and establishment of the bioretention devices, the supervising
         RPEQ must certify forms contained in section 3.15 of the Construction and
         Establishment Guidelines: Swales, Bioretention Systems and Wetlands (Water by
         Design, 2009). These forms and certification must be submitted to council prior to the
         sealing of the survey plan.
    107. A construction hold point with a council delegate must be established once the
         bioretention device underdrainage pipe work is installed. At the time of inspection, a
         sample of the drainage layer, transition layer, and filtration media materials must be
         stockpiled onsite accompanied by laboratory results that demonstrate that the media
         complies with the specifications contained in the latest version of the Guidelines for Soil
         Filter Media in Bioretention Systems (Facility for Advancing Water Biofiltration) and that
         the minimum hydraulic conductivity of 180mm/hr or as specified on the approved
         engineering plans will be achieved. The drainage layer, transition layer, and filtration
         media materials shall not be installed until the catchment draining to the bioretention
         device has 80% groundcover as determined by council’s delegate.
    108. Eighty percent (80%) of the catchment flowing to the bioretention basin must be
         effectively stabilised prior to the construction holdpoint for the Bioretention device.
    109. Prior to the release of the plan of survey, the supervising RPEQ must certify must certify
         that all hardstand areas of the development drain to a bioretention device designed and
         constructed in accordance with all relevant conditions of this approval, the Water by
         Design Bioretention Technical Design Guidelines, relevant aspects of the IPWEAQ
         Standard Drawing WSUD-drawing series and Construction and Establishment
         Guidelines: Swales, Bioretention Systems and Wetlands (Water by Design, 2009).
    Bioretention Devices - Landscaping
    110. Landscape plans must include a mixture of at least five of the following species for
         planting in the bioretention basin extended detention surface at a minimum density of 8
         plants/m2:
          a.    Carex appressa

                                                                                       Page 26 of 29
Log in to download the original file

2022-02-17 Ordinary Meeting Agenda(PDF, 431KB).pdf · 441 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.