Appendix E - Construction Management Plan.pdf
Environmental Management Plan
MANAGEMENT SYSTEMS
Eff. Date:
Rev.: E Pg. 4 of 20
15/07/2020
PROJECT GOALS AND OBJECTIVES
PROJECT • Comply with legal obligations.
OBJECTIVES
• Maintain a practical and efficient management system.
• Proactively support environment strategies on the project.
• Provide a safe and healthy working environment.
• Engage subcontractors that align with BBN Constructions and their Client’s goals and
strategies.
• Ensure that subcontractors are competent to meet their accountabilities and
responsibilities and perform their duties.
• Ensure that all persons involved in the project demonstrate safe behaviours of work.
• Plan programs and work activities to minimise or eliminate risk.
• Ensure that incidents, accidents and issues are reported and managed.
KEY Type Description Objective
ENVIRONMENTAL
TARGETS 1. Environmental An environmental incident that poses a serious Primary: Nil for the project.
Emergency risk to human health and/or the environment
and could significantly impact on construction Secondary: Nil for the
activities. project
The incident would require the involvement of
one or more of the emergency services.
2. Moderate An environmental incident that poses a Primary: Nil for the project.
environmental moderate level of risk to human health and/or
incident the environment and may impact on Secondary: maximum 1
construction activities. for the project
The incident is likely to require a co-ordinated
response at project level.
3. Minor An environmental incident that poses a minor Primary: Nil for the project.
environmental risk to human health and/or the environment
incident the effects of which are short term and can be Secondary: maximum 1
dealt with using standard procedures. (i.e. for the project
small diesel spill)
LEAD • Investigate all actual and potential incidents within 24 hours of the event.
INDICATORS
• Close out unsafe practices and conditions within the time frame stipulated in the BBN
Constructions EHS Management System (Note: time frames are determined by risk
rating.)
• Follow up and close out of non conformance documentation.
• Close out audit non-compliances.
• Ensure review and close off of Subcontractor documentation.
• Achieve > 85% performance result on Environment audits.
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Appendix E - Construction Management Plan.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.