Appendix E - Construction Management Plan.pdf

of 127
                                   Environmental Management Plan
                                                        MANAGEMENT SYSTEMS
                                                                     Eff. Date:
                                                                                        Rev.: E               Pg. 4 of 20
                                                                    15/07/2020



PROJECT GOALS AND OBJECTIVES

PROJECT         •   Comply with legal obligations.
OBJECTIVES
                •   Maintain a practical and efficient management system.
                •   Proactively support environment strategies on the project.
                •   Provide a safe and healthy working environment.
                •   Engage subcontractors that align with BBN Constructions and their Client’s goals and
                    strategies.
                •   Ensure that subcontractors are competent to meet their accountabilities and
                    responsibilities and perform their duties.
                •   Ensure that all persons involved in the project demonstrate safe behaviours of work.
                •   Plan programs and work activities to minimise or eliminate risk.
                •   Ensure that incidents, accidents and issues are reported and managed.

KEY                   Type                            Description                                 Objective
ENVIRONMENTAL
TARGETS         1. Environmental    An environmental incident that poses a serious     Primary: Nil for the project.
                Emergency           risk to human health and/or the environment
                                    and could significantly impact on construction     Secondary: Nil for the
                                    activities.                                        project
                                    The incident would require the involvement of
                                    one or more of the emergency services.

                2. Moderate         An environmental incident that poses a             Primary: Nil for the project.
                environmental       moderate level of risk to human health and/or
                incident            the environment and may impact on                  Secondary: maximum 1
                                    construction activities.                           for the project
                                    The incident is likely to require a co-ordinated
                                    response at project level.

                3. Minor            An environmental incident that poses a minor       Primary: Nil for the project.
                environmental       risk to human health and/or the environment
                incident            the effects of which are short term and can be     Secondary: maximum 1
                                    dealt with using standard procedures. (i.e.        for the project
                                    small diesel spill)
LEAD            •   Investigate all actual and potential incidents within 24 hours of the event.
INDICATORS
                •   Close out unsafe practices and conditions within the time frame stipulated in the BBN
                    Constructions EHS Management System (Note: time frames are determined by risk
                    rating.)
                •   Follow up and close out of non conformance documentation.
                •   Close out audit non-compliances.
                •   Ensure review and close off of Subcontractor documentation.
                •   Achieve > 85% performance result on Environment audits.

Log in to download the original (Appendix E - Construction Management Plan.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.