Original source · versioned page text
Appendix E - Construction Management Plan.pdf
Environmental Management Plan
MANAGEMENT SYSTEMS
Eff. Date:
Rev.: E Pg. 5 of 20
15/07/2020
Risk management process comprises of a number of actions which identify, evaluate and control the chance of something happening that
will have an impact on an objective (i.e., zero incidents).
Risk management process comprises:
1. Identification of the Risk
2. Analysis of the Risk
3. Evaluation of the Risk
4. Treatment of the Risk
5. Monitor and review of control measures for the Risk
Where construction activities require an evaluation of risk, the Risk Tables on the following pages will be used:
Consequence Probability
Level Name Description Level Name Description
1 Negligible Negligible environmental impact. A Almost certain The event will probably occur frequently
2 Minor On site release immediately contained. B Likely The event is likely to occur in most
circumstances
3 Moderate On site release contained with external C Could occur The event could occur sometime
assistance.
4 Major Loss of production capabilities. Off site D Unlikely Could happen, but is not likely to occur
release contained with outside treatment
and little detrimental impact. ,
5 Extreme Death, toxic release off site with detrimental E Rare Highly unlikely in any circumstance
effect.
Consequence
Probability Risk action
1 2 3 4 5
EXTREME The risk has the potential to cause significant detrimental long-term effects
A H H E E E
on the environment, community and/or public health.
Catastrophic and/or extensive chronic discharge or persistent hazardous
pollutant.
Corrective action is immediate
HOLD POINT – HSEQ Advisor approval required to continue.
HIGH Medium to long term detrimental environment or social impact.
B M H H E E
Possible source of community annoyance.
Corrective action within the same shift.
WITNESS POINT – HSEQ Advisor to be advised of actions to be taken,
prior to continuation.
MODERATE Reversible medium term and local impact.
C L M H E E
No lasting detrimental effect on the environment (i.e. minor transient release
of pollutant) or minor social impact.
Corrective action within 48 hour HSEQ Adviser approval required to
proceed
LOW The risk does not pose any risk to the environment, but may require
observation to ensure that the risk does not escalate.
D L L M H E No direct approval required.
26 L L M H H
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Appendix E - Construction Management Plan.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.