                                                         Environmental Management Plan
                                                                                      MANAGEMENT SYSTEMS
                                                                                                    Eff. Date:
                                                                                                                             Rev.: E                   Pg. 5 of 20
                                                                                                   15/07/2020


Risk management process comprises of a number of actions which identify, evaluate and control the chance of something happening that
will have an impact on an objective (i.e., zero incidents).
Risk management process comprises:
            1.   Identification of the Risk
            2.   Analysis of the Risk
            3.   Evaluation of the Risk
            4.   Treatment of the Risk
            5.   Monitor and review of control measures for the Risk
Where construction activities require an evaluation of risk, the Risk Tables on the following pages will be used:


                              Consequence                                                                           Probability

 Level            Name                            Description                         Level              Name                          Description
   1         Negligible          Negligible environmental impact.                       A         Almost certain         The event will probably occur frequently

   2         Minor               On site release immediately contained.                 B         Likely                 The event is likely to occur in most
                                                                                                                         circumstances

   3         Moderate            On site release contained with external                C         Could occur            The event could occur sometime
                                 assistance.

   4         Major               Loss of production capabilities. Off site              D         Unlikely               Could happen, but is not likely to occur
                                 release contained with outside treatment
                                 and little detrimental impact. ,

   5         Extreme             Death, toxic release off site with detrimental         E         Rare                   Highly unlikely in any circumstance
                                 effect.



                              Consequence
Probability                                                                                                Risk action
                  1       2       3           4      5

                                                               EXTREME            The risk has the potential to cause significant detrimental long-term effects
       A          H       H       E           E      E
                                                                                  on the environment, community and/or public health.
                                                                                  Catastrophic and/or extensive chronic discharge or persistent hazardous
                                                                                  pollutant.
                                                                                  Corrective action is immediate
                                                                                  HOLD POINT – HSEQ Advisor approval required to continue.

                                                                  HIGH            Medium to long term detrimental environment or social impact.
       B          M       H       H           E      E
                                                                                  Possible source of community annoyance.
                                                                                  Corrective action within the same shift.
                                                                                  WITNESS POINT – HSEQ Advisor to be advised of actions to be taken,
                                                                                  prior to continuation.

                                                              MODERATE            Reversible medium term and local impact.
       C          L       M       H           E      E
                                                                                  No lasting detrimental effect on the environment (i.e. minor transient release
                                                                                  of pollutant) or minor social impact.
                                                                                  Corrective action within 48 hour HSEQ Adviser approval required to
                                                                                  proceed

                                                                    LOW           The risk does not pose any risk to the environment, but may require
                                                                                  observation to ensure that the risk does not escalate.
       D          L       L       M         H        E                            No direct approval required.



       26         L       L       M         H        H

Log in to download the original (Appendix E - Construction Management Plan.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.