Appendix E - Construction Management Plan.pdf

of 127
                                            Environmental Management Plan
                                                                 MANAGEMENT SYSTEMS
                                                                              Eff. Date:
                                                                                                  Rev.: E                 Pg. 11 of 20
                                                                             15/07/2020


Category/Activity      Aspect       Potential Impact/Risks           Risk Rating                   Target                                    Actions and Controls                        Residual
                                                                                                                                                                                           Risk
                                                                 C      P     Initial
                                                                               Risk
                                       waste removal
                                       requirements and costs,

                                •     Noise pollution.           2      B          H    •   Maintain a reasonable           •   Plant, equipment and machinery to be fitted with            M
                    Noise and   •     Discomfort to site
                                                                                            acoustic environment for            noise reducing attachments (i.e. mufflers).
                                                                                            living and use of properties
                    vibration         personnel and adjoining                               impacted by constructions       •   Plant, equipment and machinery to be maintained in
                                      neighbors and                                         activities.                         accordance with manufacturers specifications.
                                      properties.
                                                                                        •   Establish consultation          •   Works (so far as is practicable) to be completed
                                                                                            and/or communication                during approved work hours (i.e. per DA, Council or
                                                                                            policies to advise property         EPA conditions).
                                                                                            occupiers of the potential      •   As applicable, install noise and vibration monitors to
                                                                                            impact of construction              measure and record discomfort levels.
                                                                                            activities.
                                                                                                                            •   Completion of applicable plant or equipment
                                                                                        •   No complaints requiring             Checklists at arrival of plant on site and before
                                                                                            corrective action.                  commencement of works.
                                                                                        •   Implement work and              •   Daily inspections of Plant and works activities.
                                                                                            construction practices
                                                                                            which seek to minimise the      •   Investigate noise complaints or causes of excessive
                                                                                            impact of noise and                 noise and implement control measures as required
                                                                                            vibration of personnel and          to manage noise emissions.
                                                                                            properties.

                                •     Degradation of surfaces    1      C          L    •   No traffic or other             •   Protect footpaths, kerbs and roads from damage              L
                    Use of            and kerbs due to                                      infringement notices.               through (e.g.) use of metal plates, restriction of
                                      excessive force or                                                                        heavy vehicles, prohibition for storing equipment or
                    roads and         weight of heavy                                   •   No damage to roads,                 material on roads and footpaths etc.
                                                                                            footpaths, gutters,
                    footpaths         vehicles and plant.
                                                                                            culverts, etc.                  •   Ensure that hoardings, fencing etc is positioned and
                                •     Impact on the safety of                                                                   secured to prevent damage, hazardous or incidents.
                                      pedestrians and other
                                      road users from                                                                       •   Provide information to subcontract personnel in
                                      obstructions and                                                                          order to coordinate delivery mechanisms.
                                      degradation of surfaces.                                                              •   Conduct daily inspections of activities against the
                                •     Impact on safe                                                                            conditions noted in regulatory permits.
                                      access/egress.

Log in to download the original (Appendix E - Construction Management Plan.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.