Category/Activity Aspect Potential Impact/Risks Risk Rating Target Actions and Controls Residual
Risk
C P Initial
Risk
Water Quality
Entering Uncontrolled 2 B H Entering Minimal to nil Entering • Identify vulnerable locations on site and L
Stormwater site stormwater site locations on site for site install control devices* to halt or alter
creates stormwater to enter, course of water.
unacceptable pond or discharge.
safety or health *sand bags, hay bales, spoon drains
risks. etc
• Inspections prior to a major weather
event.
Exiting Potential to carry 2 B H Exiting Zero incidents of Exiting • Identify vulnerable drains, low points L
site sediment into a site sediment discharge site and stormwater run off points.
watercourse. into a watercourse
• Install control devices (i.e. silt fencing,
bunding, diversion devices, sand bags,
etc).
• Daily inspections and maintenance of
control devices.
• Inspections following a major weather
event.
• Deterioration of ground 2 B H • Movement of surface • Installation of approved surface water drainage L
Surface or storm water quality. water occurs via systems to control water runoff.
designated discharge
water points. • Where required, monitor water quality and
implement a testing regime (i.e. pH, solids, etc)
• On site where degrade water quality is suspected.
activities/substances do
not impact on water • Prior to major surface disturbances, install drainage
quality. structures for waterways, catch drains to intercept
flow.
• Erosion and sediment
Control Plan implemented • Take all reasonable and practicable measurers to
on the site. minimise the potential for the release of
contaminants to surface waters that could adversely
• As required, water quality affect he environment.
parameters defined and
monitored by external • Conducted detailed inspections after significant rain
parties. events to check status of control measures.
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Appendix E - Construction Management Plan.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.