Appendix E - Construction Management Plan.pdf
Environmental Management Plan
MANAGEMENT SYSTEMS
Eff. Date:
Rev.: E Pg. 14 of 20
15/07/2020
Category/Activity Aspect Potential Impact/Risks Risk Rating Target Actions and Controls Residual
Risk
C P Initial
Risk
• Implement bunded areas for on-site washing or
refuelling or location of machinery which could emit
environmentally harmful substances (i.e. grout
injected piles).
• Daily inspections and monitoring of water
management controls.
Waste
• Increased disposal 2 C M • Implement practicable • Install waste bins for separate waste streams. L
Management
costs. measures to reduce waste (Where space prohibits, implement a system of co-
generated on projects mingled bins for recyclable materials).
• Increased through the
housekeeping implementation of a WMP. • Ensure that regulated or contaminated waste is
requirements to disposed of by a licensed disposal locations by
maintain the site in a • Meet corporate and project licensed contractors.
clean and tidy condition. based waste recycling
targets • Implement a waste management program (WMP) on
• Environmental pollution site.
into waterways, roads
etc. • Include waste minimisation requirements in
Subcontract Agreements, trade requirements and
during trade tendering.
• Daily inspections.
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Appendix E - Construction Management Plan.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.