Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

Appendix E - Construction Management Plan.pdf

of 127
                                          Environmental Management Plan
                                                                MANAGEMENT SYSTEMS
                                                                             Eff. Date:
                                                                                                Rev.: E             Pg. 14 of 20
                                                                            15/07/2020


 Category/Activity   Aspect       Potential Impact/Risks            Risk Rating                   Target                                Actions and Controls                       Residual
                                                                                                                                                                                     Risk
                                                                C      P     Initial
                                                                              Risk

                                                                                                                        •   Implement bunded areas for on-site washing or
                                                                                                                            refuelling or location of machinery which could emit
                                                                                                                            environmentally harmful substances (i.e. grout
                                                                                                                            injected piles).
                                                                                                                        •   Daily inspections and monitoring of water
                                                                                                                            management controls.
Waste
                              •     Increased disposal          2      C          M    •   Implement practicable        •   Install waste bins for separate waste streams.            L
Management
                                    costs.                                                 measures to reduce waste         (Where space prohibits, implement a system of co-
                                                                                           generated on projects            mingled bins for recyclable materials).
                              •     Increased                                              through the
                                    housekeeping                                           implementation of a WMP.     •   Ensure that regulated or contaminated waste is
                                    requirements to                                                                         disposed of by a licensed disposal locations by
                                    maintain the site in a                             •   Meet corporate and project       licensed contractors.
                                    clean and tidy condition.                              based waste recycling
                                                                                           targets                      •   Implement a waste management program (WMP) on
                              •     Environmental pollution                                                                 site.
                                    into waterways, roads
                                    etc.                                                                                •   Include waste minimisation requirements in
                                                                                                                            Subcontract Agreements, trade requirements and
                                                                                                                            during trade tendering.
                                                                                                                        •   Daily inspections.

Log in to download the original (Appendix E - Construction Management Plan.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.