Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

Appendix E - Construction Management Plan.pdf

of 127
                      Environmental Management Plan
                                            MANAGEMENT SYSTEMS
                                                       Eff. Date:
                                                                          Rev.: E            Pg. 17 of 20
                                                      15/07/2020

TRAINING        General     Training of employees is a vital part of BBN Constructions
                            environmental management practice.
                            All contractors will be required to attend a site induction before they are
                            allowed to work on the project, where they will be made aware of
                            environmental procedures (at varying levels of detail, depending on
                            their duties).

           Site Induction   A e p yees are briefed as t a y specia e vir    e ta c cer s
                            bef re c  e ci g w r      a pr ect a d are e c uraged t suggest
                             ew ideas
                            Typica y the e vir     e ta i ducti    f site pers e ccurs i
                            para e with the site safety i ducti pr cedures a d rec rded
                            i ducti register
                            The project induction will include at least the following environmental
                            content:
                            •   CMP overview
                            •   Project Environmental Policy
                            •   Roles and responsibilities and site management contact details
                            •   Green Star principles
                            •   Required and precluded substances Waste Management Plan,
                                including the site recycling targets and processes
                            •   Recycle bin colour codes
                            •   Prescribed and prohibited substances
                            •   Environmental ‘hot spots’ (risks)
                            •   Key environmental issues and controls
                            •   Emergency response
                            •   Incident reporting
                            •   Pe a ties f r waste c    ta i ati

                   Other    Subcontract companies supplying personnel to work in the project are
                            required to ensure, their personnel have been provided with training in
                            any or all of the following applicable areas:
                            •   Air quality monitoring
                            •   Contaminated land
                            •   Erosion and sedimentation control – principles and practice
                            •   Hazardous substances/dangerous goods management practices
                            •   Noise monitoring
                            •   Vibration
                            •   Water quality monitoring
                            •   Waste management

Log in to download the original (Appendix E - Construction Management Plan.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.