Skip to the record
Every meeting, every word.

Original source · versioned page text

Appendix E - Construction Management Plan

of 127

Page text read automatically using OCR, there may be inaccuracies

                                                                                                                                           Paper size A3 Map has been designed to be reproduced in colour
All underground cables shall be treated as being energised. Where a cable is located that is                                                                                                                For Emergency Situations
not represented on the ENERGEX BYDA map, then ENERGEX shall be contacted immediately.                                                                                                                          please call 13 19 62




                                                                                                                                                                                                                                                        BYDA

                                                                                                                                                                                                                                         Sequence: 241592813
                                                                                                                                                                                                                                         Date: 08/07/2024
                                                                                                                                                                                                                                         Scale: 1:500
                                                                                                                                                                                                                                         Tile No: 1




                                                                                                                                                                                                                                             For a full list of Map
                                                                                                                                                                                                                                               Symbols, please
                                                                                                                                                                                                                                             refer to the supplied
                                                                                                                                                                                                                                               BYDA Symbology
                                                                                                                                                                                                                                                 Legend page




                                                                                                                                                                                                                                             AS5488 Category “D” Plan




                                                                                                                                                                                                                                         DISCLAIMER:        While      reasonable
                                                                                                                                                                                                                                         measures have been taken to ensure the
                                                                                                                                                                                                                                         accuracy of the information contained in
                                                                                                                                                                                                                                         this plan response, neither Energex nor
                                                                                                                                                                                                                                         PelicanCorp shall have any liability
                                                                                                                                                                                                                                         whatsoever in relation to any loss,
                                                                                                                                                                                                                                         damage, cost or expense arising from
                                                                                                                                                                                                                                         the use of this plan response or the
                                                                                                                                                                                                                                         information contained in it or the
                                                                                                                                                                                                                                         completeness or accuracy of such
                                                                                                                                                                                                                                         information. Use of such information is
This output provides details of the ENERGEX electrical network. As variations map exist no responsibility is incurred by ENERGEX for the                                                                                                 subject to and constitutes acceptance of
accuracy or completeness of the information provided. Exact positions of cables and electrical connectivity should be confirmed on site.                                                                                                 these terms.


Plans generated 08/07/2024 by Pelicancorp TicketAccess Software | www.pelicancorp.com                                                                                                                                                  Energex - Response Plan.docx (13 Mar 2023)

Log in to download the original (Appendix E - Construction Management Plan.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.