Original source · versioned page text
Appendix E - Construction Management Plan
Paper size A3 Map has been designed to be reproduced in colour
All underground cables shall be treated as being energised. Where a cable is located that is For Emergency Situations
not represented on the ENERGEX BYDA map, then ENERGEX shall be contacted immediately. please call 13 19 62
BYDA
Sequence: 241592813
Date: 08/07/2024
Scale: 1:500
Tile No: 2
For a full list of Map
Symbols, please
refer to the supplied
BYDA Symbology
Legend page
AS5488 Category “D” Plan
DISCLAIMER: While reasonable
measures have been taken to ensure the
accuracy of the information contained in
this plan response, neither Energex nor
PelicanCorp shall have any liability
whatsoever in relation to any loss,
damage, cost or expense arising from
the use of this plan response or the
information contained in it or the
completeness or accuracy of such
information. Use of such information is
This output provides details of the ENERGEX electrical network. As variations map exist no responsibility is incurred by ENERGEX for the subject to and constitutes acceptance of
accuracy or completeness of the information provided. Exact positions of cables and electrical connectivity should be confirmed on site. these terms.
Plans generated 08/07/2024 by Pelicancorp TicketAccess Software | www.pelicancorp.com Energex - Response Plan.docx (13 Mar 2023)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Appendix E - Construction Management Plan.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.