Appendix E - Construction Management Plan
Working near
nbn cables TM
nbn has partnered with Dial Before You Dig to give you a single point of contact to
get information about nbn underground services owned by nbn and other utility/service
providers in your area including communications, electricity, gas and other services. Contact
with underground power cables and gas services can result in serious injury to the worker, and
damage and costly repairs. You must familiarise yourself with all of the Referral Conditions
(meaning the referral conditions referred to in the DBYD Notice provided by nbn).
Practice safe work habits
Once the DBYD plans are reviewed, the Five P’s of Excavation should be adopted in conjunction with your safe work practices
(which must be compliant with the relevant state Electrical Safety Act and Safe Work Australia “Excavation Work Code of
Practice”, as a minimum) to ensure the risk of any contact with underground nbn assets are minimised.
Plan: Plan your job by Prepare: Prepare for Pothole: Non- Protect: Protecting Proceed: Proceed only
ensuring the plans your job by engaging destructive potholing and supporting when the appropriate
received are current a DBYD Certified (i.e. hand digging or the exposed nbn planning, preparation,
and apply to the work Plant Locator to help hydro excavation) underground asset is potholing and
to be performed. Also interpret plans and should be used to the responsibility of protective measures
check for any visual identify on-site assets. positively locate nbn the worker. Exclusion are in place.
cues that may indicate Contact nbn should underground assets zones for nbn assets
the presence of you require further with minimal risk of are clearly stated in the
services not covered in assistance. contact and service plan and appropriate
the DBYD plans. damage. controls must be
implemented to ensure
that encroachment
into the exclusion
zone by machinery
or activities with the
potential to damage
the asset is prevented.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Appendix E - Construction Management Plan.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.