Appendix E - Construction Management Plan
Working near nbn cables TM
Identify all electrical hazards, assess the When using excavators and other Workers and equipment must
risks and establish control measures. machinery, also check the location of maintain safety exclusion zones
overhead power lines. around power lines.
Once all work is completed, the excavation should be re-instated with the same type of
excavated material unless specified by nbn. Please note:
• Construction Partners of nbn may require additional controls to be in place when performing
excavation activities.
• The information contained within this pamphlet must be used in conjunction with other
material supplied as part of this request for information to adequately control the risk of
potential asset damage.
Contact
All nbn™ network facility damages must be reported online here.
For enquiries related to your DBYD request please call 1800 626 329.
Disclaimer
This brochure is a guide only. It does not address all the matters you need to consider when working near our cables. You must
familiarise yourself with other material provided (including the Referral Conditions) and make your own inquiries as appropriate.
nbn will not be liable or responsible for any loss, damage or costs incurred as a result of reliance on this brochure.
This document is provided for information purposes only. This document is subject to the information classification set out on this
page. If no information classification has been included, this document must be treated as UNCLASSIFIED, SENSITIVE and must not
be disclosed other than with the consent of nbn co. The recipient (including third parties) must make and rely on their own inquiries
as to the currency, accuracy and completeness of the information contained herein and must not use this document other than
with the consent of nbn co. Copyright © 2021 nbn co limited. All rights reserved.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Appendix E - Construction Management Plan.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.