Skip to the record
Accept no imitations.

Original source · versioned page text

Appendix E - Construction Management Plan

of 127

Page text read automatically using OCR, there may be inaccuracies

Traffic Management Plan - MPH09-BBN-ELAN-TMP-01
Unit Construction – 65-67 ELANDA St, Sunshine Beach, QLD. 4567
______________________________________________________________________________________




Fig.1b – Site Location Overview Satellite. (Google 2022)

Existing site features as provided:
     ➢ QUEEN OF COLONIES PARADE (at access point site)
         •     1-lane, 2-way Residential Carriageway
         •     Total road width: 6m approx. (Through/Through/configuration)
         •     NO marked roadside PARKING AREA.
         •     Total travel path: 6m approx.
         •     No marked Cycle Lane
         •     ONE 1.5m approx. width footpath, east side of road terminating at the northern end of the site.
         •     7.8m approx. Verge from road edge to property fence line




MPH09-BBN-ELAN-TMP-01                               Document uncontrolled when printed or saved                  Page 7 of 61

Log in to download the original (Appendix E - Construction Management Plan.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.