Original source · versioned page text
Appendix E - Construction Management Plan
Traffic Management Plan - MPH09-BBN-ELAN-TMP-01 Unit Construction – 65-67 ELANDA St, Sunshine Beach, QLD. 4567 ______________________________________________________________________________________ 2. PROJECT OVERVIEW 2.1 PROJECT BACKGROUND The proposed works are located at 65-67 Elanda St, Sunshine Beach, QLD 4567. Elanda St is a category 1 residential (AGTTM V1.1 Pt8 Section2) road connecting Culgoa St and Pacific Ave crossing over Ferguson St. The scope of works involves construction of a residential accommodation block containing 4 multi-storey apartments, the scope also covers all supporting infrastructure, landscaping for paths driveways and road surface correction immediately in front of the premises. The works also include the modification and reinstatement of any existing network elements in order to facilitate the works. All site is located next to a 2-way road with mid to low pedestrian traffic. There is no bus routes through the site, however stops 317890 and 302191 are located on Pacific Ave, And are not expected to be impacted by the scope of works. 2.2 WORKS LOCATION Fig.1a – Site Location Overview. (Google 2022) MPH09-BBN-ELAN-TMP-01 Document uncontrolled when printed or saved Page 6 of 61
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Appendix E - Construction Management Plan.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.