Appendix E - Construction Management Plan
Traffic Management Plan - MPH09-BBN-ELAN-TMP-01
Unit Construction – 65-67 ELANDA St, Sunshine Beach, QLD. 4567
______________________________________________________________________________________
CONSIDERED OPTIONS – General site set up and operations not impacting through traffic
TMD: Dennis Miles
On Road Traffic (Light vehicles incl. with trailers, motor cyclists, delivery vans, etc)
Option Analysis Decision
Traffic through the Worksite Insufficient room for construction activities
Not Used
(QGTTM Part 3 Section 4) does not satisfy worker separation requirements
Sufficient road width to allow complete
containment of sight during construction phase
with deliveries and storage area to be fenced off.
Traffic past the Worksite:
Speed restriction implemented, to allow safe
Speed restriction and warning signs Optimal Treatment
egress of delivery vehicles and site traffic
(QGTTM Part 3 Section 5)
Satisfies worker separation requirements
Allows long term hoarding of equipment when
placed behind a suitable fence system
Full road closure not required at all times during
Detour Not Used
construction
Unnecessary for the scope of works
insufficient area for construction of side track due
Side-track to urban environment Not Used
Traffic around the Worksite
insufficient area for construction of side track due
(QGTTM Part 3 Section 2
to interference with utility services
Harmonised)
Additional construction works required to
facilitate contraflow
Contraflow Additional unwarranted negative impact on Not Used
network
inconsistent with minimal lane requirements
Pedestrians ( Established footpaths. School children, disabled, families and pets, postal services)
Option Analysis Decision
Existing pathway on the Eastern side of the
Elanda Street terminates at Northern boundary of
construction area.
Pedestrian controls and site fencing to prevent
unauthorized access.
Pedestrians then diverted across the street using
Leave on footpath Optimal Treatment
existing driveways and ramps.
Temporary pedestrian ramp to be installed on
Pacific Avenue.
Pedestrians to be diverted across Pacific avenue
when access across Elanda street from East to
west is impeded by construction works.
insufficient area for construction of side track due
to urban environment
Divert (Side-track) Not Used
insufficient area for construction of side track due
to interference with utility services
Shared Pathway north of Queen of colonies Pde
Detour Not Used
unaffected by scope of works.
MPH09-BBN-ELAN-TMP-01 Document uncontrolled when printed or saved Page 29 of 61
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Appendix E - Construction Management Plan.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.