Appendix E - Construction Management Plan
Traffic Management Plan - MPH09-BBN-ELAN-TMP-01
Unit Construction – 65-67 ELANDA St, Sunshine Beach, QLD. 4567
______________________________________________________________________________________
Risk Assessment - Table 2 - Site-specific Risks
CONSEQUENCE
CONSEQUENCE
LIKELIHOOD
LIKELIHOOD
RESIDUAL
RESIDUAL
RESIDUAL
RATING
RATING
RISK CONTROLS
PRE COMMENCEMENT Communication of plan to all relevant
Confusion as a result of unclear or persons, with adequate time for
misleading information to review and approval.
stakeholders. D 4 21 Information to be gathered, reviewed, A 4 10
Inaccurate information used in Traffic and assessed by TMD /NTO.
Management Plan Timely notification via Community
Assumptions. engagement or VMS signs
Adequate scheduling and notification
of pre-start meeting details.
ON SITE PRE-START
Works not to commence without pre-
Not all required team members in
start.
attendance. C 3 13 A 3 6
Sign on required at pre-start.
Information not adequately relayed.
Alcohol testing undertaken at daily
Persons unfit for work
pre-start. along with declaration of
fitness.
Accredited and competent traffic
TGS IMPLEMENTATION / REMOVAL
controllers to be used.
Traffic Guidance Scheme and Notes
Audit and inspections of the TGS to be
not followed.
undertaken.
Implementation sequence not
Devices to be in good condition, clean,
followed.
and regularly maintained.
Incorrect or inadequate devices
Scratched or non-reflective signs shall
selected and installed.
D 4 21 not be used. B 4 14
Inventory of devices inadequate
TGS to include inventory of required
(device unavailability).
signs that will be checked prior to the
Clash with existing services.
shift.
Liability for road incidents or
All signs on permanent posts to be
accidents.
installed using vacuum excavation.
Injury to Workers, Traffic Control, or
Set up to be recorded as recorded as
damage to plant.
outlined with TMP.
Speed monitoring.
USE OF IMPLEMENTED TGS
Communication and supervision from
Noncompliance with speed controls.
Supervisors.
Noncompliance with speed controls
Communication to workforce during
by workers.
induction that only Traffic Control can
Unauthorised modification or
modify a set up.
tampering of devices
Monitoring of Bureau of Meteorology
Unusual events (strong winds, heavy
C 3 13 by site supervisor and provision of wet A 3 6
rain, cyclones, etc)
weather gear.
Working in the proximity to plant.
Exclusion zones to plant to be
Working in the proximity to live
communicated at pre-start.,
traffic.
maintained, and monitored.
Injury to Workers, Traffic Control, or
Exclusions zones to live traffic to be
damage plant.
communicated at pre-start.,
Proximity of Excavations
maintained and monitored.
USE OF VARIABLE MESSAGE SIGNS VMS to be maintained with daily pre-
(VMS) start. check.
C 4 18 A 4 10
Failure of VMS. VMS to have wheels removed and
Vandalism or damage to VMS cabinets padlocked
MPH09-BBN-ELAN-TMP-01 Document uncontrolled when printed or saved Page 41 of 61
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Appendix E - Construction Management Plan.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.