Appendix E - Construction Management Plan

of 127

Page text read automatically using OCR, there may be inaccuracies

Traffic Management Plan - MPH09-BBN-ELAN-TMP-01
Unit Construction – 65-67 ELANDA St, Sunshine Beach, QLD. 4567
______________________________________________________________________________________




                                                      CONSEQUENCE




                                                                                                                                        CONSEQUENCE
                                         LIKELIHOOD




                                                                                                                           LIKELIHOOD
                                                                                                                            RESIDUAL


                                                                                                                                          RESIDUAL


                                                                                                                                                      RESIDUAL
                                                                    RATING




                                                                                                                                                       RATING
                   RISK                                                                      CONTROLS



 USE OF TRAFFIC CONTROLLERS
  Fatigue.                                                                   Adequate number of traffic
  Actions that are not complaint with                                         controllers, Traffic Utes, and Traffic
   the requirements of TCASAP.                                                 control devices to be procured.
  Insufficient number of traffic                                             Supervision and NCR process to be
   controllers.                                                                followed.
  Poor communication.                                                        Communication to be maintained via
                                           D            4           21                                                        B             4           14
  Manual strains and sprains.                                                 the designated UHF channel.
  Slips, trips, and falls.                                                   Non-work related discussions (I.e.
  Inadequate lighting                                                         chatter) to be banned in the site rules
                                                                               and communicated during the site
                                                                               induction.
                                                                              Lighting plant to be utilised as required


 LOCAL ACCESS, EGRESS AND
 INTERACTION
                                                                              Device implementation as per QGTTM.
  Noncompliance with device or
                                                                              UHF communication that is site wide.
   required travelled path.
                                                                              Local access and egress to be
  Noncompliance with traffic              D            4           21                                                        B             4           14
                                                                               maintained.
   controller direction.
                                                                              Advanced community notification and
  Loss of local access and egress.
                                                                               consultation.
  Non-social or intimidating
   behaviour.
                                                                              Device implementation as per QGTTM.
 PEDESTRIAN ACCESS AND INTERACTION
                                                                              UHF communication that is site wide.
  Noncompliance with device or
                                                                              Local access and egress to be
   required travelled path.
                                                                               maintained.
  Noncompliance with traffic
                                           D            4           21        Advanced community notification and            B             4           14
   controller direction.
                                                                               consultation.
  Loss of local access and egress.
                                                                              TC to be present at all crossing points
  Non-social or intimidating
                                                                               to assist members of the public as
   behaviour.
                                                                               required




MPH09-BBN-ELAN-TMP-01                    Document uncontrolled when printed or saved                                                        Page 42 of 61

Log in to download the original (Appendix E - Construction Management Plan.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.