Skip to the record
Search everything, all in one place.

Original source · versioned page text

Appendix E - Construction Management Plan

of 127

Page text read automatically using OCR, there may be inaccuracies

Traffic Management Plan - MPH09-BBN-ELAN-TMP-01
Unit Construction – 65-67 ELANDA St, Sunshine Beach, QLD. 4567
______________________________________________________________________________________
                                                        Implement approved TGS
 EFFECT ON VULNERABLE ROAD
                                                        Adequate signage, sight distance, and
 USERS
                                                         travelled path.
  Interaction of pedestrians and
                                                        Smooth and maintained surfacing.
   cyclists.
                                                        Adequate number of traffic
  Inadequate surfacing of detour
                                                         controllers to provide assistance or
   paths for cyclists and cyclists.    D     5    24                                             B   5       19
                                                         detect issue if required.
  Confusion of elderly, infirm, or
                                                        Temporary paths to be geometrically
   intoxicated road users.
                                                         capable of catering for mobility
  Use of mobility scooters and/or
                                                         scooters and wheel chairs.
   wheel chairs.
                                                        Works to be conducted outside of
  Interaction with children.
                                                         peak use of child care facilities
                                                        Ongoing communication with the
 WORK SHIFT DELAY
                                                         TMC.
  Excessive delays.
                                                        Provision for emergency
                                       C     3    13                                             A   3       6
                                                         reinstatement of works.
                                                        Provision for rotation of workers and
                                                         controllers.
                                                        Application and approval of Road
 EMERGENCY VEHICLES
                                                         Corridor Permit and SW Disruption
  Emergency Vehicles delayed in
                                       C     4    18     Permit.                                 B   4       10
   works.
                                                        Communication with the Traffic
  Emergency vehicles disorientated.
                                                         Management Centre.




MPH09-BBN-ELAN-TMP-01                  Document uncontrolled when printed or saved                   Page 44 of 61

Log in to download the original (Appendix E - Construction Management Plan.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.