Original source · versioned page text
Appendix E - Construction Management Plan
Traffic Management Plan - MPH09-BBN-ELAN-TMP-01
Unit Construction – 65-67 ELANDA St, Sunshine Beach, QLD. 4567
______________________________________________________________________________________
Implement approved TGS
EFFECT ON VULNERABLE ROAD
Adequate signage, sight distance, and
USERS
travelled path.
Interaction of pedestrians and
Smooth and maintained surfacing.
cyclists.
Adequate number of traffic
Inadequate surfacing of detour
controllers to provide assistance or
paths for cyclists and cyclists. D 5 24 B 5 19
detect issue if required.
Confusion of elderly, infirm, or
Temporary paths to be geometrically
intoxicated road users.
capable of catering for mobility
Use of mobility scooters and/or
scooters and wheel chairs.
wheel chairs.
Works to be conducted outside of
Interaction with children.
peak use of child care facilities
Ongoing communication with the
WORK SHIFT DELAY
TMC.
Excessive delays.
Provision for emergency
C 3 13 A 3 6
reinstatement of works.
Provision for rotation of workers and
controllers.
Application and approval of Road
EMERGENCY VEHICLES
Corridor Permit and SW Disruption
Emergency Vehicles delayed in
C 4 18 Permit. B 4 10
works.
Communication with the Traffic
Emergency vehicles disorientated.
Management Centre.
MPH09-BBN-ELAN-TMP-01 Document uncontrolled when printed or saved Page 44 of 61
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Appendix E - Construction Management Plan.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.