Appendix E - Construction Management Plan
Traffic Management Plan - MPH09-BBN-ELAN-TMP-01
Unit Construction – 65-67 ELANDA St, Sunshine Beach, QLD. 4567
______________________________________________________________________________________
Risk Assessment – Table 3 – Plan-specific Risks
CONSEQUENCE
CONSEQUENCE
LIKELIHOOD
LIKELIHOOD
RESIDUAL
RESIDUAL
RESIDUAL
RATING
RATING
RISK CONTROLS
WIDE LOADS Availability to communicate with
Wide loads inadequate for the driver or escort via UHF channel 40.
setup of site. Communication and notification with
C 4 18 A 4 10
the Traffic Management Centre.
TC to monitor UHF40 and coordinate
assistance where required
Implement Approved TGS
TRAFFIC ACCIDENTS AND/OR
Client engaged towing company
CONGESTION
TC to monitor traffic flows and
Traffic Accidents or incidents. D 4 21 B 4 14
coordinate to relieve congestion as
Excessive delays.
soon as possible, TMC to be notified.
Injury caused by crash
Follow on site Emergency procedures
All deliveries and subcontractors to be
DELIVERIES
sent internal site VMP and
Improper access and egress into
access/egress details as required by
site.
Chain of Responsibility legislation.
Non-adherence to Vehicle D 4 21 A 4 10
The designated UHF channel to be
movement Plan for internal site
communicated and monitored.
movements
Constant onsite supervision from BBN
Poor communication
or TC
All personal and plant to have access
ONSITE COMMUNICATIONS
to Personal and/or vehicle UHF Radio.
Poor communication
UHF radio channel to be monitored
Unavailability of UHF radios
C 5 22 for use with the chosen channel A 5 15
Interference with UHF Channel.
communicated at the daily pre-start.
Inadequate capacity of UHF
Spare Radios to be kept charged on
Channel.
site
Towing Company available to shift
NIGHT WORKS
vehicles if required.
Vehicles blocking site
Advanced delineation of car parks if
Poor visibility.
required in the implementation or
Unavailability or uncontactable
use.
resources or key personal. D 5 24 B 5 19
Night wands and night compliant
work attire to be used
Lighting plant to be utilised as
required
Key contact list maintained.
PLANT STORAGE AND VEHICLE
PARKING
Plant and materials adequately
Congestion and obstructed site
stockpiled and delineated.
distances. C 3 13 A 3 6
Plant and materials to not adversely
Improper storage of materials.
affect traffic controllers line of sight.
Materials or plant inadequately
stored within 8m of roadway.
MPH09-BBN-ELAN-TMP-01 Document uncontrolled when printed or saved Page 43 of 61
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Appendix E - Construction Management Plan.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.