Appendix E - Construction Management Plan
SUNSHINE RESIDENCES
65-67 Elanda St, Sunshine Beach
Where necessary the Head Contractor shall seek the advice of the Relevant Authorities and forward any
instruction made to the appropriate parties involved. Records of all non-conformance reports shall be kept
on site.
12. ENVIRONMENTAL TRAINING
As part of their Site induction/training all personnel engaged in the works shall be made aware of the
provisions of this Construction and Environmental Management Plan (CEMP) in order to promote a general
awareness of the environment and to minimize any potential impact to it. Environmental induction and
training shall be appropriately commensurate with their roles and environmental responsibilities in the
project. Evidence of environmental induction and training of personnel in this project shall be maintained on
the project records.
13. APPENDICES
Appendix 1: Site Plan and General Complex Design
Appendix 2: Site Locality
Appendix 3: Dial before you dig
Appendix 4: Traffic Management Plan
Appendix 5: Construction Program
Appendix 6: Dilapidation Report (Actioned at OP Works Approval Stage)
Appendix 7: Non-Conformance Report Template
Appendix 8: Erosion and Sediment Control Measures
Appendix 9: Environmental Management Plan
Appendix 10: Waste Management Plan - (Actioned at Op Works Approval Stage)
BBN Constructions
4 Progress Road, Maroochydore P a g e |7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Appendix E - Construction Management Plan.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.