Original source · versioned page text
2016-10-17 GC Agenda - Item 8 - Attachment 2 (Amended) - Statement of Financial Position
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Schedule 3: Charging Infrastructure Specifications
The specifications in this Schedule 3 are the minimum requirements for the Charging
Infrastructure, and do not relieve the Lessor from the performance and compliance requirements
of the Lease.
47
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.