Original source · versioned page text
2016-10-17 GC Agenda - Item 8 - Attachment 2 (Amended) - Statement of Financial Position
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Schedule 2: Ticketing Equipment Manual
CUBIC ticketing equipment to be provided by TransLink for wiring and installation by the
Lessor during the bus build process. The DCU to be fitted in driver cabin. Two smartcard
readers to be fitted at front door and two smartcard readers at rear door. All CUBIC ticketing
equipment to be installed as per the specifications in the TransLink Ticket Equipment
Manual.
A coin tray shall be supplied by the Lessor in each bus adjacent to the driver's position. A
retainer tray shall be supplied and installed on each bus for an existing Sunbus cash box.
46
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.