Original source · versioned page text
2016-10-17 GC Agenda - Item 8 - Attachment 2 (Amended) - Statement of Financial Position
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Schedule 11: Service Schedule
64
Schedule 11: Service Schedule
: ice Schedul
montss[ Ts es a ss to ta
feed wre | tT UT ht UT hE | CE | |
nrmewrgesrnercrumnsiongecremaonnesnons | * | | | [| { | | | | | | | Jf
swe eT TT UT ET
dashboard
|check that the pantograph moves freelyupanddown TP
[check auto greasing system isfull(ifequipped)
[check airpressureofthetyres 0
limttncionctiniencion seuiersonianezrnigazionee | * | | [| [| [| | | | | | [| | | |
|checkpowersteeringoillevel
[Overall check and perform any necessary adjustments, tighteningete | Tx TT
[Replace powersteering oilfiiterelement Tx
[Drain air tanks and checkformoisture TT
|checkucaPfunction a ee
fenammemcrowecremee | | | e P e f e Px te tet et ete tet] |
Check the high voltage connection wires of electrical assemblies such as voltage
[check the insulation ofthe ucaP assembly PP ee
nrnevcsrarconronngesraretensenitncinnacomcnoe | | | * | » |» | x |» | | «tx |e | «| «|: |
[check the UCAP airconditioning compressoroil TP ee ee
foasiingeotepime | TT * Te Te |e | le | x | x | eT | ee | |
older) and high voltage guide wires
|checkbowpantograpguidechain
[check bow pantograp electromagnetic induction switch | TT ee ee ee
[check bow pantograp air cylinder assembly, cover, airpipe&connector | [| CT x OT x OT x Tx fT x Tx Tx Tx TP x fT x Tx Tx |
eee TT te Pett ddd
|check anddrainthe bowpantographyairtank TT x Te xk Tk Tx xk Tx Tx TP x PT x Tx Tx |
components.
[check motor drivesystemfunction 0 ee
[check vehicle ACandheater system 0 ee
[check frontaxlesndrearade 0
|check the body ofwehicle, accessories, wheels andtyres TTT OT x Te ke a ee
[Drainvehicle airtanksandcheckformoisture Te
[Grease all lubrication points
fcaccamerersnongriomgeasrmaimir | | TT x TT | UL x | oT «TT Te |
inspect, clean, tighten and check insulation of vehicle controller, DCDC converter,
[check UCAP assembly, low voltage and communication wireharness [TT
ee
|checkthebow pantograph insulation Te
Check bow pantograph air control box including direction control valve (solenoid
connector
[Replace air compressorintakefiterelement PP
[Replace air dryerdesiccantcartridee Pe
[clean thedust fromthe outsideoftheucap Pe
|checkthe UCAPantiexplosionvalve
|checkthenitrogen pressureintheucaPbox TT
[Replace UCAP A/Creceiver/dryer andrrefillrefrigerantandcompressoroi |] | TT eT
|Adiustbow pantograph groundterminalboard TP
|checkbow pantograph beamandframe
[check bow pantograph baseboard including insulation terminal TTP
‘ee TT rT UE UE CT ET
system
[Replace air compressoroilandfiiter
[Replace wheelmotorolSee the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.