1. Customer emission limits
1.1. Voltage fluctuations (Rule $5.3.7)
The Customer must ensure that the voltage fluctuations caused by variations
in loading level at the connection point, including those arising from
energisation, de-energisation or other operation of plant, must not exceed the
voltage fluctuation emission limits specified by ENERGEX.
: Short and long term flicker emission limits
Individual Short Term Emission individual Long Term
Py =P
Rapid Voltage Changes Emission Limits (Starting Condition) is given in the
following table:
The maximum voltage change AU/UN for normal operating conditions is
expressed in percent of the actual voltage in the table below. A customer may
cause voltage changes, depending on the repetition frequency of these
changes. Where AU is steady state voltage Change and UN is Steady state
voltage.
Emission Limits for voltage changes in function of the number of
changes per hour, r
Sone) Fee) as
pur" 24041BV(LV) | 33KV (MV)
jE ES
Pp tersiO) PCS
<rs1000 |
— 100<rs1000 fF SK
1.2. Harmonics and voltage notching (Rule $5.3.8)
The Customer must ensure that the harmonic voltage distortion caused by
non-linearity, commutation of power electronic equipment, harmonic
resonance and other effects within the plant, must not exceed the harmonic
emission limits specified by ENERGEX.
66See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.