Original source · versioned page text
2016-10-17 GC Agenda - Item 8 - Attachment 2 (Amended) - Statement of Financial Position
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
68
Project Name: Noosa Council _ | Project Number: RO506688 _
| so | ots | os | ose | so | ls
| st | oe | to | ts | |
| | sts | os | oss | oso | os
| ss] oe | lt | ts | |
| se | ots | os | ose | oso | es
Ee
| se | os | lots | ote | os |
ee ee
ae ee ee
368 coe | ots | ote | 036 |
40 | oes] ots | ots | os | os
mo | so | so | wo | 50 | 200 |
PC
Isc = Maximum short-circuit current at PCC or POE
1.3. Balancing of load currents (Rule S5.3.6)
a) ENERGEX requires a connected Customer's load to be balanced across
all phases in order to maintain the negative sequence voltage at each
connection point at less than or equal to the limits of the system standards
por the nominal supply vollage level, being as set out in the following
table:
pare | etc i
supply voltage | Maximum negative sequence voltage (% of nominal voltage)
(kV)
| Column 2 | Column 3 | Column4 | Columné |
zee
ota | ATa | me leone
contingency | contingency once per hour
event event
average average
MWorless | 20 | 20 | 25 | 30 |
b) The Customer must ensure that it meets for connections at voltages less
than 30 kV, that the current in any phase is not greater than 105 percent
or less than 95 percent of the average of the currents in the three phases.
68See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.