2016-10-17 GC Agenda - Item 8 - Attachment 2 (Amended) - Statement of Financial Position

of 70

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

69

Project Name:      Noosa Council     _             Project Number:      RO506688
1.4    Power factor requirements (Rule $5.3.5)
       (a)    If the power factor falls outside the relevant performance standard (as
              outlined below) over any critical    loading  period  nominated   by
              ENERGEX, the Customer must, where required by ENERGEX in order
              to maintain satisfactory voltage levels at the connection point. This
              may be achieved by installing additional reactive plant or reaching a
              commercial agreement with ENERGEX to install, operate and maintain
              equivalent reactive plant as part of the connection assets or by
              alternative commercial arrangements with another party.
       (b)    \f a Customer installs shunt capacitors to comply with power factor
              requirements   it  must   comply    with  ENERGEX's      reasonable
              requirements to ensure that the design does not severely attenuate
              audio frequency signals used for load control or operations, or
              adversely impact on harmonic voltage levels at the connection point.
      (c)     The performance standard relevant to this clause is:
              Pursuant to clause 36(2)(d) of the Electricity Regulation, ENERGEX
              requires the Customer to ensure that the power factor of the
              Customer's load is:
        i.      for low voltage supply to the Customer, at least 0.8 lagging; and
        ii.    for high voltage supply to the Customer, is within the range stated in
                Schedule 5.3.5.2 of the National Electricity Rules.

        Customer Agreement
        | agree to rectify any interference to ENERGEX network after commissioning
        the electrical load.
       Signature:                     Date:        ween eneeeee en ----
        NeM@: neneensenn onsen          Company:     ««=sas.02-2--2.--

                                                                                                              69
Log in to download the original file

2016-10-17 GC Agenda - Item 8 - Attachment 2 (Amended) - Statement of Financial Position(PDF, 2MB).pdf · 2.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.