NOOSA COUNCIL IDAS Development Application Decision Notice 8 of 15
59. A registered easement shall be created over any stormwater drainage pipes or pits within the site that
collects stormwater from a Council road.
60. No building or other structure shall be constructed or encroach over an easement.
Earthworks & Site Stability
61. Earthworks carried out on site shall not affect the structural integrity of any of the existing land or
structures that border the development site. To this end all works shall be undertaken in accordance with
the recommendations of a Geotechnical Engineer or similar qualified expert which identifies suitable
building foundations and any measures that may be required to protect the stability of adjoining buildings
if Precinct E2 has been constructed and/or structures and/or land
Acid Sulfate Soils
62. As the site is located below the 20m AHD and above the 5m AHD, any excavation works consisting of
1OOm3 or greater which extends below 5m AHD will need to be carried out in accordance with State
Planning Policy 2/02 Planning and Managing Development Involving Acid Sulfate Soils. In this regard
appropriate testing and supporting documentation prepared by a suitably qualified specialist shall be
submitted to Council for approval prior to obtaining a Development Permit for Operational Works.
Erosion and Sediment Control
63. Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site
control measures such as silt fencing, controlled gravel access to the site and controlled disposal of
waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are required to be submitted
to the Council for approval prior to obtaining a Development Permit for Operational Works.
Contributions Towards Council Infrastructure
64. Monetary contributions shall be paid to Noosa Council towards the cost of providing and/or upgrading
various infrastructure at the rates applicable at the time of payment. An estimate only of the contribution
amounts under the current Council policies and requirements is outlined in the table below:
Contribution Required For., Amount:
PSP16 - Sewerage Headworks Contributions $142,959
PSP17 -Water Supply Headworks Contributions $456,837
PSP20 - Pathway Trunk Network Contributions $65,473
TOTAL Contribution Amount = $665,269
Please note, that these amounts are all subiect to variations In the Consumer Price Index, All Groups Brisbane
from June 2007 until the date of payment.
All contributions must be paid prior to the issue of a Development Permit for Operational Works.
Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the contributions
not be paid at the due time, Council shall call upon the trading bank guarantee in full.
Processing of bonds for security where specific Council approval has been given for the bonding of
contributions will incur an administration fee in accordance with Council's Land Development Commercial
& Regulatory Fees at the time of lodgement.
65. In the event that the Development Permit for Material Change of Use of Premises lapses or is cancelled,
the trading bank guarantee will be returned.
General
66. A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
specifications for all engineering works that will become Council infrastructure, which shall be submitted in
conjunction with an application for a Development Permit for Operational Works. In this regard a
DXF/DWG file on GDA94 zone 56 grid of the proposed cadastre layout is to be submitted in conjunction
with any application for Operational Works.
67. Any damage caused to any public utility during the course of construction shall be repaired to Council's
standards and at no cost to Council.
68. Any alteration of any public utility or other facilities necessitated by the development of the land or
associated construction works external to the site shall be at no cost to Council.
MG j:ldatawrks%wrkcache11478732%05-1133 ndn.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.