NOOSA COUNCIL IDAS Development Application Decision Notice 7 of 15
48. All stormwater drainage shall be collected on site and discharged to the internal lakes (within the Noosa
Springs development) In accordance with previous approvals.
49. Stormwater run-off from the carparking areas and the driveways shall have the first flush (the first 12 mm
of rainfall or hose-down) collected in grease/oil arrestors (or similar devices) provided on site to ensure
that polluted run-off such as oil and grease are separated from the main body of stormwater and do not
enter the internal lakes of the Noosa springs Golf Course.
All other clean stormwater, such as roof water, can be collected on site and discharged through a single
underground drain line directly into the existing drainage system, bypassing the grease/oil arrestor.
To this end, a detailed maintenance plan shall be prepared for the proposed grease/oil arrestors, which
shall be submitted to the Council for approval prior to obtaining a Development Permit for Operational
Works.
The approved maintenance plan shall be continued to be complied with for the duration of the approved
Use.
50. All site stormwater drainage shall be by means of a gravity system.
Sewer Mains
51. The site shall be connected to Council's existing sewerage reticulation systems and be constructed in
accordance with Council's standards and requirements at no cost to Council.
52. All internal reticulation sewers as indicated on Tate Professional Engineers Dwg C1732/05/F-PO5
Revision G dated 07/06/07 are to be designed and constructed in accordance with Planning Scheme
Policy 6, Engineering Design Standards - Water & Sewerage.
53. Internal Reticulation Sewers are to discharge to existing manholes NH17/41/05 and NH17/11/19. Where
a sewer outlet traverses a separately titled Precinct E2, it shall be designed as a Council-owned sewer
and be constructed in accordance with NSC requirements and contained in a registered easement in
favour of Noosa Shire Council.
Town Water Supply
54. The site shall be connected to Council's existing town water supply and be constructed in accordance with
Council's standards and requirements at no cost to Council.
55. All internal private water reticulation mains as indicated on Tate Professional Engineers Drawing
C1732/05/F-PO5 Revision G dated 07/06/07 are to be designed and constructed in accordance with
Planning Scheme Policy 6, Engineering Design Standards - Water & Sewerage.
56. A single water metered connection must be located outside the property boundary and in an easily
assessable location to facilitate unhindered reading by Council and/or Council's contracted water meter
readers, and not behind fences or locked gates. In this regard approval of the water meter configuration
and location must be obtained from Council's Water & Sewerage Capital Works Manager prior to
lodgement and approval of hydraulic drawings.
57. The applicant is advised that this development may require the provision of fire hydrants and a booster
pump in accordance with the Building Code of Australia, and consultation may also be needed with
Queensland Fire Services to ensure suitable fire fighting infrastructure is provided. To this end any
necessary fire hydrants shall be clearly shown on the plans submitted for any Operational Works approval
and if a booster pump is deemed necessary, the plans shall indicate where the fire truck is to be
accommodated in order to provide boosting to the water supply.
Service Easements (Sewer / Stormwater)
58. A registered easement shall be created over the zone of influence of any sewer that traverses another
parcel. The easement shall generally be parallel to and centred over the sewer main and be equivalent in
width to twice the depth to invert level of the sewer at the deepest point within the allotment (measured
from the finished surface) and be no less than 3.0m wide overall. In this regard a licensed surveyor shall
accurately locate all sewer mains and determine the necessary width of the easement, which shall be
shown on any plans submitted for Operational Works / Building Works approval. To this extent the
surveyor shall certify that the sewer and the zone of influence is wholly contained within the easement to
be created.
In addition to this the Applicant's Solicitor shall give Council's Solicitor an appropriate undertaking in
writing that the Title Deed and the easement documents will be lodged at the Land Titles Office and any
additional Titles Office forms or requisitions requiring the consent of Council will be attended to promptly.
A duly executed copy of the easement shall be submitted to Council for perusal prior to the use
commencing.
Any changes required by Council's Solicitor must be corrected immediately.
MG j'tdatawrkslwrkcache11478732105-1133 ndn.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.