Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

ASTP_Town _Planning_Rpt.pdf

of 18

Page text read automatically using OCR, there may be inaccuracies

3.3    Works Completed - Seeking Retrospective Approval
16.    It is noted that this application seeks retrospective approval for the earthworks and construction of the
       hardstand storage area, which was carried out without Council approval (refer to Figure 4 below). The
       occurrence of the works without approval was raised by Council via an Advisory Letter dated 20 March
       2023. It is intended to rectify the matter with a Development Application for Operational Works upon
       receipt of a Material Change of Use approval from Council.


            June 2020                                           May 2023




       Figure 4 Constructed works (Source: Nearmap 2023)


17.    As shown on the Contour and Detail Survey Plan in Appendix 2, a small section of pavement has been
       constructed over the front boundary of the site, into the Vision Court road reserve. The landowner
       intends to rectify the encroachment by cutting back the hardstand surface to the boundary line and
       relocating any fencing accordingly.




Our Ref: 220703                                                                                    Page 8 of 18


[OCR of page images]
3.3. Works Completed - Seeking Retrospective Approval

16. It is noted that this application seeks retrospective approval for the earthworks and construction of the
hardstand storage area, which was carried out without Council approval (refer to Figure 4 below). The
occurrence of the works without approval was raised by Council via an Advisory Letter dated 20 March
2023. It is intended to rectify the matter with a Development Application for Operational Works upon

receipt of a Material Change of Use approval from Council.

 

 

 

 

 

 

 

 

Figure 4 Constructed works (Source: Nearmap 2023)

17. As shown on the Contour and Detail Survey Plan in Appendix 2, a small section of pavement has been
constructed over the front boundary of the site, into the Vision Court road reserve. The landowner
intends to rectify the encroachment by cutting back the hardstand surface to the boundary line and
relocating any fencing accordingly.

Our Ref: 220703 Page 8 of 18

Log in to download the original (ASTP_Town _Planning_Rpt.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.