Skip to the record
Accept no imitations.

Original source · versioned page text

2020-02-11 Services and Organisation Committee Agenda

of 112

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                     11 FEBRUARY 2020


INFRASTRUCTURE SERVICES DEPARTMENT

BRANCH ACTIVITIES                          RECENT ACHIEVEMENTS                      CURRENT PRIORITIES                          THE NEXT QUARTER
Asset Management
Finalise the Noosa Spit Shoreline             Final draft of the SEMP has been       Commence planning for approvals           Prepare for SEMP implementation
Erosion Management Plan (SEMP) and              reported to Council.                     proposed in the SEMP.                       for the 2020/2021 budget.
develop an action plan to prioritise any
recommendations arising from the
SEMP
Complete Pathways & Boardwalks,               These AMPS are currently being         Complete the final draft of the AMPs      Prepare AMPs for adoption by
Parks & Playgrounds, AMP                        developed and finalised.                                                             Council.
Develop pilot Lifecycle Plans for Beach       No activities have commenced.          Develop a standard template for           Finalise lifecycle plan template and
Accesses, Sealed Roads and                                                               lifecycle plans.                            commence Beach Access Lifecycle
Stormwater asset classes.                                                                                                            Plan.
Develop a Service/Management Plan for         Data reconciliation has been           Consultation with Hastings Street         Finalise the Hastings Street service
Hastings Street Noosa.                          completed for Hastings Street            Association and finalise the                management plan.
                                                Assets.                                  Hastings Street service plan
                                              Contractor appointed and the
                                                condition assessment for Hastings
                                                Street infrastructure completed.
Asset Data Management program                 Reconciliation of Road Segment         Buildings and Stormwater                  Aligned Road Segment data for
                                                data between T1 and GIS.                 revaluations.                               Road Survey and DRFA purposes
                                              T1 Project Lifecycle Management        Development of the pathway                Asset Details Data Reports and
                                                module configuration remains in          condition assessment guidelines             Dashboard.
                                                progress.                                and maintenance plans.
Business as Usual activities                  Development of the 2020/21 reseal      Preparation for the 2020/21 capital       Ongoing development of the
                                                program.                                 works program.                              Technology One system to improve
                                              Continual development of asset                                                       asset inspection practices.
                                                working groups.



Buildings & Facilities
Ensure Council owned and operated             Pinnaroo Park shelter and BBQ          Shelter renewal program                   Shelter Renewal program
assets continue to follow the Noosa look        upgrade.                               BBQ renewal program                       BBQ renewal program
and feel guidelines                           Visitor Information amenities          Shower renewal                            Shower renewal
                                                upgrade.                                                                           Bottle fill stations


                                                                                            Page 42 of 112
Log in to download the original file

2020-02-11 Services and Organisation Committee Agenda(PDF, 13MB).pdf · 13.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.