Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

2020-02-11 Services and Organisation Committee Agenda

of 112

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                           11 FEBRUARY 2020


BRANCH ACTIVITIES                           RECENT ACHIEVEMENTS                           CURRENT PRIORITIES                             THE NEXT QUARTER
Management of Council engaged                  Plumbing trade services contract            Fire, electrical and pest control            Finalise tenders for fire, electrical
contractors to maintain levels of service        commenced                                     tenders                                        and pest control.
and ensure availability of staff during a      Drainage trade services contract
disaster.                                        commenced
Ensure compliance of shire wide assets         Test and tag electrical devices             Test and tag                                 Continue as per scheduled
to meet legislative requirements               Back flow prevention                        Electrical RCD testing                         maintenance of all compliance and
                                               Fire services                               Back flow prevention                           legislative requirements.
                                               Lift maintenance                            Fire services
                                               Air conditioning maintenance                Air conditioning maintenance
Delivery of 90% of the Capital Works           Installation of Tewantin Admin              Shelter renewal program                      Shelter renewal program
Program as approved by the CWE                   building security upgrade                   BBQ renewal program                          BBQ renewal program
                                                 completed.                                  Shower renewal                               Shower renewal
                                               Installation of Pelican Place security      Cooroy Butter Factory roof upgrade           Cooroy Butter Factory roof upgrade
                                                 upgrade completed.                            tender assessment                              construction
                                                                                             Tewantin SES building roof upgrade           Tewantin SES building roof upgrade
                                                                                               quotes being prepared.                         construction.
Review of systems and services to              Public amenities service level review       Develop tenders and ITQ for                  Finalise tenders for legislative
maintain a high service level.                   completed.                                    legislative services (fire & electrical        requirements (fire & electrical and
                                                                                               & pest control in community                    pest control in community buildings)
                                                                                               buildings)
Business as Usual activities                   Commencement of electrical                  Back flow prevention.                        Planned maintenance activities
                                                 apprentice                                  Shire Assets compliance for                  Reactive maintenance activities
                                               Visitor Information Centre amenities          FY19/20
                                                 upgrade                                     Security working group
                                               Commencement of Back Flow                   Building and Facilities working
                                                 prevention                                    group.
                                               Tewantin Admin office upgrades for
                                                 new starters
                                               Commencement of Shire assets
                                                 compliance for FY19/20.
Civil Operations
Implement QitPlus system for reporting         Alternative methods to the QitPlus          Group text messaging to be used by           Evaluate trial & determine whether
by on call officers.                             Survey application are under                  On Call Officers as an interim                 to trial QitPlus application.
                                                 consideration that will utilise               measure.
                                                 Council’s Corporate IT system.              Commence trial using the corporate
                                                                                               system.


                                                                                                  Page 43 of 112
Log in to download the original file

2020-02-11 Services and Organisation Committee Agenda(PDF, 13MB).pdf · 13.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.