2020-02-11 Services and Organisation Committee Agenda

of 112

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

SERVICES & ORGANISATION COMMITTEE MEETING AGENDA                                        11 FEBRUARY 2020


BRANCH ACTIVITIES                          RECENT ACHIEVEMENTS                         CURRENT PRIORITIES                           THE NEXT QUARTER
Develop a Strategic Tree Management           Weeping Paperbark removal and             Six Month Progress Review to               Formalise the tree inspection
Plan                                            replacement program completed               Executive Team                               program
                                              Tree inspection program in precinct       Inspections and planning of                Continue to capture tree data for
                                                areas ongoing and required works            proactive tree works to inform 20/21         other precinct areas in the Shire.
                                                undertaken e.g. removal of                  budget development                         Continue progress of proactive
                                                defective Coconut Palms on                                                               works program at
                                                Gympie Terrace foreshore.                                                                Sunrise/Castaways and Marcus
                                              Noosa Waters palms removal and                                                           Beach
                                                replacement program
Contribute to improved asset                  Continued involvement in various          Engagement with working groups             Ongoing participation in Asset
management outcomes through                     Working Groups including: Roads,            regarding renewal candidates for             Working Groups.
involvement in the Asset Working                Bridges, Stormwater, Parks &                20/21 capital budget consideration.
Groups                                          Playgrounds.
Develop a plan for street lighting            Implementing LED lighting as              Address lighting issues identified in      Work with the Asset Planning team
including: Renewal program for rate 3           replacement for failed lights as per        the Pedestrian Crossing Audit                to populate lighting condition data in
lighting, review of level of service to         Streetlighting Working Group              Emergent Renewal Project Brief for           Council’s asset system
inform a plan for lighting upgrades and         recommendation. Sites for new               Claude Batten Dr & Main Beach
reducing ad hoc installations,                  LED light fittings include Claude           Boardwalk lighting
Opportunities to implement LED lighting.        Batten Dr path & Main Beach               Preparation of submission to
                                                Boardwalk.                                  establish a lighting renewal program
                                              Focus on addressing lighting              Undertake the next quarterly Rate 3
                                                defects identified through the 3            lighting inspection
                                                monthly inspection and any
                                                customer requests to have identified
                                                faults repaired prior to Christmas
                                                especially in any park areas or high
                                                use areas.
Conduct Business Improvement Review           Completed procurement and                 Provision of information to                Finalise the review & consider
of the Branch                                   appointment of a suitable consultant        consultant in advance of site visit.         recommendations
                                                to undertake the review.
Review Branch Workforce Plan in               70% of MyPlans finalised for              Finalise remaining Performance             Conduct a review of the MyPlan
conjunction with the Corporate                  outdoor staff.                              Plans for field staff.                       process and collate feedback on
Workforce Planning Project                    All Take 5s completed in the              Library staff to present to Pomona           how to improve next time.
Undertake a project in conjunction with         electronic format.                          depot staff.                               Review the Branch Workforce Plan
Libraries Branch to improve computer                                                      Training needs for 20/21 budget              taking into account the Service
literacy for field workers                                                                                                               Review results.
Performance Plans for Field Staff



                                                                                               Page 44 of 112
Log in to download the original file

2020-02-11 Services and Organisation Committee Agenda(PDF, 13MB).pdf · 13.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗