Town Planning Assessment Report

of 37

Page text shows just the words. Original shows the document exactly as it was published.

 Other Works Codes

 The development will be serviced by standard urban infrastructure provisions including
 reticulated water, sewer, electricity, telecommunications, and stormwater. Stormwater from the
 impervious areas throughout the site will be discharged to an existing field inlet positioned in the
 rear landscaped area. The field inlet is piped through the adjoining land to the east (Lot 2 SP11587)
 to council stormwater network within Station Street. Please refer to Appendix B – Existing
 Stormwater Drainage Plans for further details.

 The development will also provide building design that appropriately responds to Noosa’s
 subtropical climate through:
     • Provision of lightweight timber cladding; and
     • Eaves and a large covered deck that will large that provide shading to the walls and
        weather protection.




6. Conclusion
This report has identified that the proposed development complies with the relevant benchmarks
contained within the Noosa Plan 2020 and does not raise any significant issues that cannot be
addressed by reasonable and relevant conditions on the following basis:
    + the proposal provides a well-designed building incorporates an articulated façade comprising
        a mix of building materials, eaves a large deck and timer cladding that complements the
        traditional character of Pomona.
    + vehicular access, car parking and service areas have been designed to be safe and efficient
        and are complemented by landscaping and shade trees that will maintain and enhance the
        streetscape of the surrounding area;
    + the development can be appropriately connected to and services by all necessary urban
        infrastructure including reticulated water, sewer, electricity, telecommunications, and
        stormwater; and
    + the development does not result in any offsite impacts including by way of noise, light, glare,
        dust or odour emissions or stormwater runoff, traffic or environmental impacts.

This office trusts that the information supplied comprehensively addresses all of the issues that are to
be considered by the Noosa Plan 2020. Should you have any questions in relation to the proposal, or
any aspect of the development, please do not hesitate to contact the undersigned on 0423 952 928
or via email [email protected]

Yours sincerely,




Marcus Brennan
B. Urb. Reg. Plan.


                                                                                           Page 37 of 37
Log in to download the original file

Town Planning Assessment Report.pdf · 3.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.