Original source · versioned page text
2020-10-21 Final Order - Approval Conditions and Approved Plans - P&E Appeal No 61 of 2018 - RAL17-0504
Plans and drawings: the text below has words only, no drawings.
Document Status Version Doc type Reviewed by Approved by Date issued 03 DRAFT Greg Hansell Steve Clark 10 Feb 2020 06 FINAL Steve Clark Steve Clark 27 Feb 2020 Project Details Project Name 135 Lake Weyba Drive, Noosaville Client Andres Gabarrin Client Project Manager Andres Gabarrin Water Technology Project Manager Richard Sharp Water Technology Project Director Steve Clark Authors Richard Sharp Document Number 5865_R02_V06_Final_FEMP.docx COPYRIGHT Water Technology Pty Ltd has produced this document in accordance with instructions from Andres Gabarrin for their use only. The concepts and information contained in this document are the copyright of Water Technology Pty Ltd. Use or copying of this document in whole or in part without written permission of Water Technology Pty Ltd constitutes an infringement of copyright. Water Technology Pty Ltd does not warrant this document is definitive nor free from error and does not accept liability for any loss caused, or arising from, reliance upon the information provided herein. Level 3, 43 Peel Street South Brisbane QLD 4101 Telephone (07) 3105 1460 Fax (07) 3846 5144 ACN 093 377 283 ABN 60 093 377 283 Flood Emergency Management Plan | 27 February 2020 135 Lake Weyba Drive, Noosaville Page 3 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.