Original source · versioned page text
2020-10-21 Final Order - Approval Conditions and Approved Plans - P&E Appeal No 61 of 2018 - RAL17-0504
Plans and drawings: the text below has words only, no drawings.
CONTENTS EXECUTIVE SUMMARY 1 1 INTRODUCTION 6 1.1 Background 6 1.2 Site Details and Characteristics 6 1.2.1 Site Overview and Details 6 1.2.2 Site Topography 6 1.2.3 Site Layout 7 1.3 Flood Sources 8 2 FORECASTS AND WARNINGS 10 2.1 Overview 10 2.2 Rainfall Gauges 10 2.3 Noosa River Flood Warnings 11 2.4 Site flood monitoring system 12 3 FLOOD EMERGENCY RESPONSE 13 3.1 General 13 3.2 Risk Management Philosophy for the Site 13 3.3 Local Disaster Management Plan 13 3.4 Responsibilities 14 3.5 Conditions of Development 14 3.5.1 Community Management Statement 14 3.5.2 Floor above Probable Maximum Flood (PMF) 15 3.5.3 Flood Height Gauge 15 3.5.4 Flood Height Siren 15 3.6 Emergency Response Strategies 16 3.6.1 Overview 16 3.6.2 Shelter In Place 16 4 MANAGEMENT ACTIONS 17 4.1 Before a Flood Event 17 4.2 When a Flood is Likely 17 4.3 During a Flood – Shelter in Place 17 4.4 During a Flood – Self Evacuation 18 5 CONCLUSION 19 Flood Source 21 Flood Levels at the Site 22 Flood Depth and Hazard 23 Historic Flooding 24 Rates of Rise 26 Flood Duration 27 Evacuation Risks 27 Flood Emergency Management Plan | 27 February 2020 135 Lake Weyba Drive, Noosaville Page 4 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.