Original source · versioned page text
2020-10-21 Final Order - Approval Conditions and Approved Plans - P&E Appeal No 61 of 2018 - RAL17-0504
Plans and drawings: the text below has words only, no drawings.
Onsite Refuge Locations 29 ACTIONS REQUIRED FOR PRIMARY STRATEGY “SHELTER IN PLACE” 31 ACTIONS REQUIRED FOR “SELF - EVACUATE” 32 LIST OF FIGURES Site Evacuation Route (WaterTech 2018) 2 Figure 1-1 Site Layout and Locality (Base Map Source – Noosa Council) 6 Figure 1-2 Site Topography (Source WaterTech 2018) 7 Figure 1-3 Proposal Plan – Reconfiguration of a Lot (1 into 4) 8 Figure 1-2 Noosa River Catchment 9 Figure 2-1 Rainfall Gauge Locations (Source Bureau of Meteorology) 11 Figure 3-2 Noosa River Catchment Gauge Locations (Source – Bureau of Meteorology) 12 Figure A-1 Minor Moderate and Major Flood (source – Noosa Council 2018) 21 Figure A-2 Storm Tide Inundation (1.42m Highest Astronomical Tide) (source – Noosa Council 2018) 22 Figure A-3 Annual Peak Heights Recorded at Tewantin (Source: BoM 2018) 25 Figure A-4 1992 Historical Flood Event Hydrograph (source – Noosa Council Flood Study) 25 Figure A-5 1992 Historic Event – Modelled Rate of Rise 26 Figure A-6 Site Evacuation Route (WaterTech 2018) 28 Figure A-7 Evacuation Route Elevation Profile (Source WaterTech 2018) 29 LIST OF TABLES Table 1-1 Flood Emergency Management PLan 1 Table 2-1 Tewantin RSL Park Rainfall Gauge Parameters 11 Table 2-2 Tewantin Gauge Parameters 12 Table 3-1 Flood Height Gauge Boards – 135 Lake Weyba Drive 15 Table 3-2 Flood Height Siren – Triggers and ACtions 15 Table A-1 Flood levels at the Site 23 Table A-2 Key Levels 24 Flood Emergency Management Plan | 27 February 2020 135 Lake Weyba Drive, Noosaville Page 5 22
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.