Building Approval · MCU22/0116.01
Original PDF page 22, section 1. The text section number identifies this passage in the reader.
d. The data must be in accordance with Council’s “Planning Scheme Policy 6 –
Engineering Design Standards”, and fully detail the levels for all engineering works
including but not limited to the drainage network and structures, finished ground and
pavement surface levels.
e. Landscaping, including all assets and improvements within parks, open space and road
reserves areas are to be shown on an accompanying separate landscape plan
(prepared in .dwg file format with accompanying hardcopy PDFs) and include a
complaint ADAC XML file. Details of the landscaping and all associated assets and
improvements may be included in the ADAC XML digital file prepared for associated
civil infrastructure, or alternatively, be provided as a separate ADAC XML digital file
containing landscape and asset information only.
On Maintenance
69. All municipal works must be accepted ‘On Maintenance’ by Council in accordance with
Council’s relevant Planning Scheme Policy prior to plan sealing. To achieve ‘On
Maintenance’, the supervising RPEQ must submit to Council:
a. certification that all works have been undertaken and completed in accordance with the
requirements of this Permit
b. as Constructed details in accordance with Council’s Planning Scheme Policy
c. maintenance and operational manuals for all proprietary or site specific devices
Off Maintenance
70. Prior to requesting an Off Maintenance inspection the developer must provide a written
request for the Off Maintenance inspection.
71. A re-inspection fee in accordance with Council’s Fees and Charge Register will be charged
where:
a. a Council inspection reveals works do not comply with approval requirements
b. submitted certification falsely states works comply with approval requirements.
72. A final inspection and approval of the new driveway and completed reinstatement works by
Council’s Inspector is required. Please contact Council on 5329 6500 to arrange for the
inspection.
Landscaping
PRIOR TO COMMENCEMENT OF WORKS
73. Prior to requesting a prestart meeting:
a. Receipt of amended plans approval.
b. Receipt of arborist report
c. Tree protection fencing must be installed under the supervision of the Project Arborist.
(Refer to Retention of Existing Trees Conditions)
74. A prestart meeting must be organised with Council’s delegate by calling 5329 6500 (giving
at least five business days’ notice). The prestart meeting must be attended by the responsible
persons for:
a. Arboreal works.
b. Fauna management works.
c. Landscape works.
d. Other relevant parties.
Page 11 of 19
Document Set ID: 22234003
Version: 3, Version Date: 10/01/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Building Approval.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.