DURING CONSTRUCTION
75. All landscape works must be constructed and work procedure undertaken in accordance
with:
a. The approved plans/documents (as detailed in the table below) and conditions detailed
in this Decision Notice.
Plan No. Rev. Plan/Document Name Date
DA1.04 H Proposed Site Plan by Black Wood 25/11/2022
Architecture & Design
ED 22238 OPW - 01 A Site Layout Plan by Element Design 14/12/2022
ED 22238 OPW - 02 A Planting Plan by Element Design 14/12/2022
ED 22238 OPW - 03 A Planting Plan by Element Design 14/12/2022
ED 22238 OPW - 04 A Details Plan by Element Design 14/12/2022
ED 22238 OPW - 05 A Plant List & Spec Plan by Element 14/12/2022
Design
b. The relevant conditions of the higher order Material Change of Use approval viz.
MCU22/0116 to which this approval relates.
c. All relevant Council Planning Scheme Policies, standard drawings, standard
specifications and guidelines.
VEGETATION PROTECTION
Retention of Existing Trees and Vegetation
76. A qualified person * must be engaged for the duration of the works to:
a. Ensure works are carried out in accordance with the approved Arborist Report
b. Oversee installation of all tree protection fencing prior to commencement of any works
onsite (including any clearing).
c. Supervise tree protection within the development site and frontages, prior to, during
and following construction in accordance with AS 4970, Protection of trees on
development sites.
d. Oversee approved tree removal in proximity to retained trees.
e. Undertake a risk assessment of all trees within striking distance of the development
works and site and carry out hazard removal and amenity pruning in accordance with
AS 4373, Pruning of amenity trees.
*(Refer to Advisory Note)
Fauna Management
77. A qualified person* must be engaged to manage fauna prior and during clearing to:
a. Ensure works are carried out in accordance with the Nature Conservation Act 1992.
b. Undertake pre-clearing inspections including fauna relocation and removal or blocking
of all vacant hollows.
c. Ensure clearing works avoids nesting times of animals and birds.
d. Co-ordinate staging and sequence of clearing with fauna protection.
e. Protect and recover fauna during clearing operations (not previously removed).
Page 12 of 19
Document Set ID: 22234003
Version: 3, Version Date: 10/01/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Building Approval.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.