Council archive · source document
Building Approval · MCU22/0116.01
Original PDF page 53, section 1. The text section number identifies this passage in the reader.
Z:\Public\client jobs\2000 - 2099 jobs\id 2014 22 Delorme St Noosa Heads PLAT RES\id 2014 22 Delorme St Noosa Heads PLAT RES issue F wdwgs.pln NOTE: SUBSTITUTION OF ANY STRUCTURAL MEMBERS, SIZES, GRADES OR ANY VARIATION TO ANY PART OF THE DESIGN WILL RENDER NULL AND VOID ANY RESPONSIBILITY OF IMAGE + DESIGN PTY LTD FOR THE STRUCTURAL INTEGRITY AND PERFORMANCE OF THE BUILDING CONSTRUCTION PLANS Proposed Residence Where this occurs one or more of the following measures should be taken 5. MANUAL TASKS TIMBER FLOORS to avoid objects falling from the area where the work is being carried out This building may contain timber floors which have an applied finish. Components within this design with a mass in excess of 25kg should be 22 Delorme St onto persons below. lifted by two or more workers or by mechanical lifting device. Where this Areas where finishes are applied should be kept well ventilated during 1. Prevent or restrict access to areas below where the sanding and application and for a period after installation. Personal is not practical, suppliers or fabricators should be required to limit the Noosa Heads work is being carried out. 2. Provide toeboards to scaffolding or work platforms. component mass. Protective Equipment may also be required. The manufacturer’s recommendations for use must be carefully considered at all times. All material packaging, building and maintenance components should 3. Provide protective structure below the work area. clearly show the total mass of packages and where practical all items 1. FALLS, SLIPS, TRIPS 4. Ensure that all persons below the work area have should be stored on site in a way which minimises bending before lifting. 7. CONFINED SPACES Personal Protective Equipment. a) WORKING AT HEIGHTS Advice should be provided on safe lifting methods in all areas where EXCAVATION BUILDING COMPONENTS DURING CONSTRUCTION lifting may occur. Construction of this building and some maintenance on the building will During construction, renovation or demolition of this building, parts of Wherever possible, components for this building should be prefabricated Construction, maintenance and demolition of this building will require the require excavation and installation of items within excavations. Where the structure including fabricated steelwork, heavy panels and many off-site or at ground level to minimise the risk of workers falling more use of portable tools and equipment. These should be fully maintained in practical, installation should be carried out using methods which do not other components will remain standing prior to or after supporting than two metres. However, construction of this building will require accordance with manufacturer’s specifications and not used where require workers to enter the excavation. Where this is not practical, parts are in place. Contractors should ensure that temporary bracing or workers to be working at heights where a fall in excess of two metres is faulty or (in the case of electrical equipment) not carrying a current adequate support for the excavated area should be provided to prevent other required support is in place at all times when collapse which may possible and injury is likely to result from such a fall. The builder should electrical safety tag. All safety guards or devices should be regularly collapse. Warning signs and barriers to prevent accidental or injure persons in the area is a possibility. provide a suitable barrier wherever a person is required to work in a checked and Personal Protective Equipment should be used in unauthorised access to all excavations should be provided. Mechanical lifting of materials and components during construction, situation where falling more than two metres is a possibility. accordance with manufacturer’s specification. ENCLOSED SPACES maintenance or demolition presents a risk of falling objects. DURING OPERATION OR MAINTENANCE For buildings with enclosed spaces where maintenance or other access Contractors should ensure that appropriate lifting devices are used, For houses or other low-rise buildings where scaffolding is appropriate: 6. HAZARDOUS SUBSTANCES may be required: that loads are properly secured and that access to areas below the Cleaning and maintenance of windows, walls, roof or other components of Enclosed spaces within this building may present a risk to persons load is prevented or restricted. ASBESTOS this building will require persons to be situated where a fall from a height entering for construction, maintenance or any other purpose. The design For alterations to a building constructed prior to 1990: in excess of two metres is possible. Where this type of activity is documentation calls for warning signs and barriers to unauthorised required, scaffolding, ladders or trestles should be used in accordance 3. TRAFFIC MANAGEMENT This building may contain asbestos either in cladding material or in fire access. These should be maintained throughout the life of the building. retardant insulation material. The builder should check and, if necessary, with relevant codes of practice, regulations or legislation. Where workers are required to enter enclosed spaces, air testing take appropriate action before demolishing, cutting, sanding, drilling or For buildings where scaffold, ladders, trestles are not appropriate: For building on a major road, narrow road or steeply sloping road: equipment and Personal Protective Equipment should be provided. otherwise disturbing the existing structure. Cleaning and maintenance of windows, walls, roof or other components of Parking of vehicles or loading/unloading of vehicles on this roadway may SMALL SPACES For alterations to a building constructed prior to 1986: this building will require persons to be situated where a fall from a height cause a traffic hazard. During construction, maintenance or demolition For buildings with small spaces where maintenance or other access This building is likely to contain asbestos either in cladding material or in in excess of two metres is possible. Where this type of activity is of this building designated parking for workers and loading areas should may be required: fire retardant insulation material. The builder should check and, if required, scaffolding, fall barriers or Personal Protective Equipment be provided. Trained traffic management personnel should be responsible Some small spaces within this building will require access by necessary, take appropriate action before demolishing, cutting, sanding, should be used in accordance with relevant codes of practice, for the supervision of these areas. construction or maintenance workers. The design documentation calls drilling or otherwise disturbing the existing structure. regulations or legislation. For building where on-site loading/unloading is restricted: for warning signs and barriers to unauthorised access. These should be POWDERED MATERIALS Construction of this building will require loading and unloading of maintained throughout the life of the building. Where workers are Many materials used in the construction of this building can cause harm Anchorage points for portable scaffold or fall arrest devices are materials on the roadway. Deliveries should be well planned to avoid required to enter small spaces they should be scheduled so that access if inhaled in powdered form. Persons working on or in the building during recommended for use by maintenance workers. Any persons engaged to congestion of loading areas and trained traffic management personnel is for short periods. Manual lifting and other manual activity should be construction, operational maintenance or demolition should ensure good work on the building after completion of construction work should be should be used to supervise loading/unloading areas. restricted in small spaces. ventilation and wear Personal Protective Equipment including protection informed about any anchorage points. For all buildings: against inhalation while using powdered material or when sanding, b) SLIPPERY OR UNEVEN SURFACES Busy construction and demolition sites present a risk of collision where 8. PUBLIC ACCESS drilling, cutting or otherwise disturbing or creating powdered material. FLOOR FINISHES deliveries and other traffic are moving within the site. A traffic TREATED TIMBER Public access to construction and demolition sites and to areas under The owner is responsible for the selection of surface finishes in the management plan supervised by trained traffic management personnel The design of this building includes provision for the inclusion of treated maintenance causes risk to workers and public. Warning signs and pedestrian trafficable areas of this building. Surfaces should be should be adopted for the work site. timber within the structure. Dust or fumes from this material can be secure barriers to unauthorised access should be provided. Where selected in accordance with AS HB 198:2014 and AS 4586:2013. harmful. Persons working on or in the building during construction, electrical installations, excavations, plant or loose materials are STEPS, LOOSE OBJECTS AND UNEVEN SURFACES 4. SERVICES operational maintenance or demolition should ensure good ventilation present they should be secured when not fully supervised. Due to design restrictions for this building, steps and/or ramps are Rupture of services during excavation or other activity creates a variety and wear Personal Protective Equipment including protection against included in the building which may be a hazard to workers carrying of risks including release of hazardous material. Existing services are inhalation of harmful material when sanding, drilling, cutting or using 9. OPERATIONAL USE OF BUILDING objects or otherwise occupied. Steps should be clearly marked with both located on or around this site. Where known, these are identified on the treated timber in any way that may cause harmful material to be visual and tactile warning during construction, maintenance, demolition This building has been designed to requirements of the classification plans but the exact location and extent of services may vary from that released. Do not burn treated timber. and at all times when the building operates as a workplace. identified on the drawings. Where a change of use occurs at a later date indicated. Services should be located using an appropriate service (such VOLATILE ORGANIC COMPOUNDS Building owners and occupiers should monitor the pedestrian access a further assessment of the workplace health and safety issues in as Dial Before You Dig), appropriate excavation practice should be used Many types of glue, solvents, spray packs, paints, varnishes and some ways and in particular access to areas where maintenance is routinely accordance with the provisions of the Work Health and Safety Act 2011 and, where necessary, specialist contractors should be used. cleaning materials and disinfectants have dangerous emissions. Areas carried out to ensure that surfaces have not moved or cracked so that or subsequent replacement Act should be undertaken. In locations with underground power: where these are used should be kept well ventilated while the material is they become uneven and present a trip hazard. Spills, loose material, Underground power lines are located in or around this site. All being used and for a period after installation. Personal Protective stray objects or any other matter that may cause a slip or trip hazard 10. OTHER HIGH RISK ACTIVITY underground power lines must be disconnected or carefully located and Equipment may also be required. The manufacturer’s recommendations should be cleaned or removed from access ways. adequate warning signs used prior to any construction, maintenance or for use must be carefully considered at all times. All electrical work should be carried out in accordance with Code of Contractors should be required to maintain a tidy work site during demolition commencing. SYNTHETIC MINERAL FIBRE Practice: Managing Electrical Risks at the Workplace, AS/NZ 3012 and construction, maintenance or demolition to reduce the risk of trips and In locations with overhead power lines: Fibreglass, rockwool, ceramic and other material used for thermal or all licensing requirements. falls in the workplace. Materials for construction or maintenance should Overhead power lines are near or on this site. These pose a risk of sound insulation may contain synthetic mineral fibre which may be All work using Plant should be carried out in accordance with Code of be stored in designated areas away from access ways and work areas. electrocution if struck or approached by lifting devices or other plant harmful if inhaled or if it comes in contact with the skin, eyes or other Practice: Managing Risks of Plant at the Workplace. and persons working above ground level. Where there is a danger of this sensitive parts or the body. Personal Protective Equipment including All work should be carried out in accordance with Code of Practice: 2. FALLING OBJECTS occurring, power lines should be, where practical, disconnected or protection against inhalation of harmful material should be used when Managing Noise and Preventing Hearing Loss at Work. LOOSE MATERIALS OR SMALL OBJECTS relocated. Where this is not practical adequate warning in the form of installing, removing or working near bulk insulation material. Due to the history of serious incidents it is recommended that Construction, maintenance or demolition work on or around this building bright coloured tape or signage should be used or a protective barrier particular care be exercised when undertaking work involving steel is likely to involve persons working above ground level or above floor levels. provided. construction and concrete placement. All the above applies. image+design id + QBSA Lic. No. 1123972 www.image-design.com.au [email protected] qbcc lic.no. 113908 SHEET PROJECT DRAWN CHECKED JOB NO. Proposed Residence TAKE DESIGN UNTIL ALL OUTSTANDING © COPYRIGHT RESERVED IN PART OR WHOLE, THESE DRAWINGS ARE THE PROPERTY OF IMAGE + DESIGN. PREFERENCE CONTRACTOR / BUILDER TO VERIFY DIMENSIONS FAILURE TO NOTIFY DESIGNERS OF DISCREPANCIES DESIGNERS REMAIN THE PROPERTY OF IMAGE & PLANS PUBLISHED 0421 662 426 Ph 07 4128 1333 Fax 07 4128 1133 21/06/2024 id 2014 3 THESE TH TH DIMENSIONS INVOICES ARE PAID IN FULL 22 Delorme St www.platinumproperties.com.au THE © COPYRIGHT RESERVED IN PART OR TITLE SCALE ISSUE OF RESPONSIBILITIES VOID WHOLE, THESE DRAWINGS ARE THE PROPERTY OF PLATINUM PROPERTY Noosa Heads W.H & S. REPORT F 27 WRITTEN award winning building designs 1:100 @A3 u.n.o. SHALL GROUP
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Building Approval.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.