Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

Part 11 of 37 Appendix 9 Ecological Assessment Report MCU12/0208

of 153

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (123 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Noosa on Weyba
Ecological Assessment Report
                                                                                                              (.J-’CardnO.

Management Issue                                Proposed Management Measures

Street Lighting                                 The detailed design of the estate shall be achieved such that:


                                                >   lighting is located and orientated to minimise negative impacts on wildlife and
                                                    environmentally sensitive areas; and

                                                >   the vertical illumination resulting from direct, reflected or other incidental light

                                                    emanating from lighting does not when measured at the boundary of
                                                    environmentally sensitive areas and protected estate boundaries at any level
                                                    from ground level upward, exceed the relevant lux levels specified in the

                                                    approved VFMMP.

Nature Conservation Act                         Necessary applications for permits for clearing protected plants and/or interfering
Permits                                         with an animal breeding place would be obtained from DEHP.




5.7.2       Construction Phase

Table 5-8 provides a non-exhaustive list of the biodiversity management issues and measures that are or
relevance to the construction phase of the Noosa on Weyba project.


Table 5-8          Construction phase biodiversity management issues and measures




                                                               and maintenance of environmental offset works within the Noosa              on

                                                               and Receive land.
                                                For each stage of construction a VFMMP would be developed and would specify:
Vegetation Clearance and
Fauna Management
                                                >   that the   precise location and nature of any vegetation that is to be retained
                                                    needs to be shown on construction plans;

                                                >   the  precise nature of measures that are to be implemented to protected
                                                    vegetation identified for retention are to be specified and are to be in accord with
                                                    Australian Standard AS 4970-2009 Protection of trees on development sites
                                                                                                -




                                                    (AS4970-2009);

                                                >   that the   precise locations where vegetation clearance is permitted           must be
                                                    shown on construction plans and be physically marked in the field;

                                                >   that a pre-clearance and fauna survey must be carried out prior to the clearance
                                                    of any vegetation and that any tree hollows are to be physically examined by an

                                                    appropriately qualified, licensed and equipped Fauna Spotted Catcher;

                                                >   that no vegetation is to be cleared until any occupying fauna have self-relocated
                                                    from the  vegetation or have been safely and appropriately relocated by an
                                                    appropriately qualified, licensed and equipped Fauna Spotted Catcher (note:
                                                    Koala are not to be relocated);

                                                >   that all vegetation clearance works be carried out in a sequential manner and
                                                    under the supervision and control of an         appropriately qualified, licensed and
                                                    equipped Fauna Spotted Catcher;

                                                >   that all   vegetation that is cleared is        to   be   appropriately reused in the
                                                    enhancement of the ecological values of the Open Space Conservation Zone;

                                                >   the nature of weed and         pest species management measures that are to be
                                                    implemented.

                                                All construction personnel and contractors will be prohibited from bringing dogs from
Dogs
                                                Noosa on Weyba site during the construction phase of development.
                                                During the staged construction phase of development, appropriately fenced "off
                                                leash" areas would be established outside of the designated Open Space
                                                Conservation Zone for use          residents.
                                                Existing   barbed-wirefencing located within the Construction Site and adjacent
Fencing
                                                sectors of the Open Space Conservation Zone is to be removed.



Northbrook Corporation Pty Ltd                                         Version 1                                           30 November 2012
Ecological Assessment Report V1 30112012.docx                  Commercial in Confidence                                               Page 39

Used in these records

About this file

File size
123 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 11 of 37 Appendix 9 Ecological Assessment Report MCU12_0208.pdf · 123 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.